Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - Iron Ore

Jim_Bisdee_Pilbara_related_images.


23721.jpg

Images taken and scanned by the late Perth rail photographer Jim Bisdee.
He has kindly made these Pilbara images available for display on this site.
Copyright remains with the estate of the late Jim Bisdee.

121 files, last one added on Feb 12, 2020
Album viewed 790 times

Pilbara_Railways_Historical_Society


200914_7759.jpg

Images of the items within the PRHS museum located at 6 Mile near Rio Tinto's 7 Mile facility.
Includes locomotives from GML, HI, Mt Newman and BHP, along with a battery underground hauler from Wittenoom and some items from the Point Samson PWD.

115 files, last one added on Sep 27, 2020
Album viewed 790 times

01-06_2018


180614_1331.jpg

Images taken in the first half of 2018.
Includes images from all Pilbara iron ore produces BHP, FMG, Roy Hill and Rio Tinto.

60 files, last one added on Jun 25, 2018
Album viewed 463 times

09-12_2017


170915_0715.jpg

Images taken between September and December 2017.
Includes BHP, Roy Hill, FMG and Rio Tinto.

31 files, last one added on Dec 06, 2017
Album viewed 245 times

05-08_2017


170730_0518.jpg

Images taken between May and August 2017.
Includes BHP, Roy Hill, FMG and Rio Tinto with double ES44ACi units on the Deepdale line.

58 files, last one added on Oct 16, 2017
Album viewed 339 times

01-2016


160128_00408.jpg

Photos of new SD70ACe locomotives for BHP.
Removal of Dash 8 locos to scrap.
Scrapping of Dash 8 locos.
BHP rail action for month of January.

33 files, last one added on Jan 31, 2016
Album viewed 689 times

11-2015


151111_9500.jpg

November 2015.
11/11 Rio Cape Lambert to Western Creek.

60 files, last one added on Nov 13, 2015
Album viewed 514 times

05-2015


150523_8265.jpg

Images from May 2015.
Including FMG Solomon line action.
Reclaimer and stacker demolition.
Dash 8 scrapping.
BHP yard action and fuel tank waggons.
Finucane Island ore shuttles.

106 files, last one added on Jan 30, 2016
Album viewed 929 times

10-2014


141027_5877.jpg

Images from October 2014.
Includes the scrapping of the SD40 And AC6000 class units.

45 files, last one added on Oct 27, 2014
Album viewed 1418 times

2004_01-06


040407_075353.jpg

Digital images taken between January and June 2004.

19 files, last one added on Nov 26, 2017
Album viewed 260 times

0196


196-11.jpg

Images of triple CM40-8M units on loaded trains at BHP Yandi 2.
May 1998.

17 files, last one added on May 21, 2014
Album viewed 456 times

0197


197-05.jpg

View of empty Yarrie bound train with CM39-8 5632 at Goldsworthy Junction.

8 files, last one added on Jul 22, 2014
Album viewed 345 times

0203


203-16.jpg

AC6000 class run an empty train out of Bing Siding 6076 and 6070 mid-train 6077 following a cross with a loaded headed up by the old standard of two pairs of double CM40-8M or Dash 8 units.

26 files, last one added on Aug 16, 2014
Album viewed 518 times

0207


207-22.jpg

Koodaideri entry signs.
BHP Yandi One loadout with new AC6000 locomotives as mid-train units 6074 and 6070.
Yarrie line, Hardie Siding with C36-7M 5513 and CM40-8MEFI 5669 crossing.
See album 221 for the continued sequence at Hardie.
August 1999.

32 files, last one added on Oct 01, 2014
Album viewed 618 times

0218


218-18.jpg

BHP GML line loaded train with C36-7M.
Hamersley Iron 9-44CW bank engines at HIY Yandicoogina.

37 files, last one added on Dec 20, 2014
Album viewed 505 times

0219


219-14.jpg

Hammersley Iron 9-44CW bank engines at HIY, Yandicoogina.
BHP GML action with C36-7M locomotives.

37 files, last one added on Dec 26, 2014
Album viewed 538 times

61 albums on 4 page(s) 1

Random files - Pilbara negative and digital Albums - Iron Ore
249-11.jpg
249-1129 viewsYule River bridge looking north west downstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.
080621_2720.jpg
080621 272045 viewsTabba South, one of a batch of six flat waggons converted by Mt Newman Mining workshops by cutting down a pair of ore waggons to make one flat waggon, 6105 in service with the rail recovery and transport train as waggon #2.
230-03.jpg
230-0369 viewsYandi Two switch looking east with the Three Sisters forming the background. Empty BHP train heading for the balloon loop for loading, grade crossing is the YT 311.5 km. Geodata -22.713725, 119.055762 .
040805_095744.jpg
040805 09574459 viewsNelson Point, CFCLA CHQY type ballast waggon CHQY 741.

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional