Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions - admin
200-04.jpg
200-04241 viewsMoorine Rock, Westrail L class 271 Clyde Engineering EMD model GT26C serial 69-620 runs through the loop with the ballast cleaning train known as the Circus Train 22nd June 1997.Aug 16, 2014
200-03.jpg
200-03230 viewsMoorine Rock, Westrail L class 271 Clyde Engineering EMD model GT26C serial 69-620 runs through the loop with the ballast cleaning train, known as the Circus Train while a Perth bound freighter sits in the mainline, 22nd June 1997.Aug 16, 2014
200-02.jpg
200-02199 viewsMoorine Rock, Westrail L class 271 Clyde Engineering EMD model GT26C serial 69-620 runs through the loop with the ballast cleaning train, known as the Circus Train while a Perth bound freighter sits in the mainline, 22nd June 1997.Aug 16, 2014
199-25.jpg
199-25134 viewsMoorine Rock, Australian National AN class unit AN 6 a Clyde Engineering EMD model JT46C serial 93-1302 built in Somerton Victoria and rebuild ALF class ALF 24 arrive on the mainline with a Perth bound freight 22nd June 1997.Aug 16, 2014
199-24.jpg
199-24107 viewsMeckering, interlocking arrangement for the grain siding, east end points.Aug 16, 2014
199-23.jpg
199-2381 viewsMeckering, train 7PM5 double stacked east bound with tarped loads on the rear, 21st June 1997.Aug 16, 2014
199-22.jpg
199-22104 viewsMeckering, train 7PM5 double stacked east bound with BOX CAR and Refrigerated Rail-Way containers and reefers, 21st June 1997.Aug 16, 2014
199-21.jpg
199-21109 viewsMeckering, east bound freighter 7PM5 with former Australian National RMDY type triple deck car carriers now branded for National Rail. RMDY type built by Comeng Victoria for Commonwealth Railways in 1976 as GN type, a batch of 30 with the final 15 coded GNX, third deck added to 14 of the first 15 in 1987 and recoded to AMDF, then AMDY to RMDY in 1994.Aug 16, 2014
199-20.jpg
199-20156 viewsMeckering, National Rail NR class units NR 19 and NR 20 Goninan built GE Cv40-9i models lead train 7PM5 as they power out of the loop following a cross with the Prospector 1420 hrs 21st June 1997.Aug 16, 2014
199-19.jpg
199-19157 viewsMeckering, National Rail NR class unit NR 19 Goninan built GE Cv40-9i model heads up train 7PM5 as it departs the loop 1400 hrs 21st June 1997.Aug 16, 2014
199-18.jpg
199-18155 viewsMeckering, National Rail NR class units NR 19 and NR 20 Goninan built GE Cv40-9i models lead train 7PM5 as they power out of the loop following a cross with the Prospector 1420 hrs 21st June 1997.Aug 16, 2014
199-17.jpg
199-17153 viewsMeckering, National Rail NR class units NR 19 and NR 20 Goninan built GE Cv40-9i models lead train 7PM5 as they power out of the loop following a cross with the Prospector 1420 hrs 21st June 1997.Aug 16, 2014
199-16.jpg
199-16170 viewsMeckering, National Rail NR class units NR 19 and NR 20 Goninan built GE Cv40-9i models lead train 7PM5 as they power out of the loop following a cross with the Prospector 1420 hrs 21st June 1997.Aug 16, 2014
199-15.jpg
199-15186 viewsMeckering, Perth bound single Prospector car races along on the mainline as it crosses NR 19 on 7PM5 freighter.Aug 16, 2014
199-14.jpg
199-14181 viewsMeckering, National Rail NR class unit NR 20 Goninan built GE Cv40-9i model, cab side view of builders plate 21st June 1997.Aug 16, 2014
199-13.jpg
199-13180 viewsMeckering, National Rail NR class unit NR 20 Goninan built GE Cv40-9i model, bogie view of no. 2 end on train 7PM5 as it waits for a cross with the Prospector in the loop 1400 hrs 21st June 1997.Aug 16, 2014
199-12.jpg
199-12161 viewsMeckering, National Rail NR class units NR 19 and NR 20 both being Goninan built GE Cv40-9i models head up train 7PM5 as they wait for a cross with the Prospector in the loop 1400 hrs 21st June 1997.Aug 16, 2014
199-11.jpg
199-11168 viewsMeckering, National Rail NR class units NR 19 and NR 20 both being Goninan built GE Cv40-9i models head up train 7PM5 as they wait for a cross with the Prospector in the loop 1400 hrs 21st June 1997.Aug 16, 2014
199-10.jpg
199-10187 viewsMeckering, National Rail NR class units NR 19 and NR 20, view of back to back coupling arrangement.Aug 16, 2014
199-09.jpg
199-09194 viewsMeckering, National Rail NR class unit NR 20 Goninan built GE Cv40-9i model, cab side view on train 7PM5 as it waits for a cross with the Prospector in the loop 1400 hrs 21st June 1997.Aug 16, 2014
16146 files on 808 page(s) 645

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional