WOC type iron ore waggon WOC 31362 is one of a batch of thirty built by Goninan WA between October 1997 to January 1998 with fleet number 422 for Koolyanobbing iron ore operations with a 75 ton capacity, on loaded train 6413 at Binduli Triangle, 31st July 2010.