WO type iron ore waggon WO 31261 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 147 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, empty train arriving at Binduli Triangle, 31st July 2010.