Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Pilbara negative and digital Albums - non iron ore > 0206

206-21.jpg
206-21101 viewsCarawine Pool at Carawine Gorge, looking north.
206-22.jpg
206-22115 viewsWhere Carawine Creek joins the Oakover River.
206-23.jpg
206-23129 viewsToad yelling some sort of abuse to Pope, at Carawine Pool.
206-24.jpg
206-24126 viewsThe signs for Telfer, along the same lines as the Woodie Woodie signs.
206-25.jpg
206-25126 viewsThe signs for Telfer, along the same lines as the Woodie Woodie signs.
206-26.jpg
206-26124 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-27.jpg
206-27117 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-28.jpg
206-28121 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-29.jpg
206-29119 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-30.jpg
206-30125 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' built new in 1988 by Goninan as a GE CM39-8 model, serial 5831-12 / 88-082. The four CM39-8 units were upgraded to CM40-8 units following overhauls and finally scrapped in January 2016.
206-31.jpg
206-31197 viewsAn empty train on the Yarrie (former Goldsworthy) line behind BHP 5633 'Hephaestus' with a string of Golynx ore waggons, built by Goninan WA to a Lynx Engineering design, these are belly dump waggons as opposed to the BHP fleet of rotary dump bodies.
206-32.jpg
206-32151 viewsAn empty train on the Yarrie (former Goldsworthy) line with a string of Golynx ore waggons, built by Goninan WA to a Lynx Engineering design, and then the two types of the waggons from the Phelps Dodge Copper Mine, the ribbed units are built by Portec USA and the smooth ones built by Gunderson USA. All of these are belly dump waggons as opposed to the BHP fleet of rotary dump bodies.
206-33.jpg
206-33123 viewsAn empty train on the Yarrie (former Goldsworthy) line with a string of Golynx ore waggons, built by Goninan WA to a Lynx Engineering design, and then the two types of the waggons from the Phelps Dodge Copper Mine, the ribbed units are built by Portec USA and the smooth ones built by Gunderson USA and finally the Tomlinson Steel WA built hopper waggons. All of these are belly dump waggons as opposed to the BHP fleet of rotary dump bodies.
206-34.jpg
206-34124 viewsPope Searle getting the hang of Windows.
206-35.jpg
206-35115 viewsPossibly a spaghetti sauce.
206-36.jpg
206-36112 viewsThe fridge at 42 Kingsmill Street.
206-37.jpg
206-37158 viewsThe dining area at 42 Kingsmill Street.
     
37 files on 2 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional