Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Western Australian Negative and Digital Albums > Standard_Gauge_Iron_Ore_Waggons

100731_02421.jpg
100731 0242177 viewsWOE type iron ore waggon WOE 33312 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-017 and fleet number 811 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02422.jpg
100731 02422115 viewsWOB type iron ore waggon WOB 31396 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 320 for Koolyanobbing iron ore operations. This waggon was also converted to a WSM type ballast hopper by re-fitting the cut down top section and having bottom discharge doors fitted, converted back to WOB in 1998, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02423.jpg
100731 0242367 viewsWO type iron ore waggon WO 31222 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 117 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 6418 at Binduli Triangle, 31st July 2010. This unit was converted to WOG for gypsum in late 1980s till 1994 when it was re-classed back to WO.
100731_02424.jpg
100731 0242461 viewsWOA type iron ore waggon WOA 31304 is one of a batch of thirty nine built by WAGR Midland Workshops between 1970 and 1971 with fleet number 202 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02425.jpg
100731 0242564 viewsWO type iron ore waggon WO 31301 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 179 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 6418 at Binduli Triangle, 31st July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
100731_02426.jpg
100731 0242668 viewsWOB type iron ore waggon WOB 31395 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 325 for Koolyanobbing iron ore operations. This waggon was also converted to a WSM type ballast hopper by re-fitting the cut down top section and having bottom discharge doors fitted, converted back to WOB in 1997, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02427.jpg
100731 0242784 viewsWOE type iron ore waggon WOE 30257 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-007 and fleet number 607 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02428.jpg
100731 0242871 viewsWOE type iron ore waggon WOE 33554 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-094 and fleet number 9046 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02429.jpg
100731 0242974 viewsWOE type iron ore waggon WOE 33339 is one of a batch of one hundred and forty one built by United Goninan WA between November 2005 and April 2006 with serial number 950142-044 and fleet number 838 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02430.jpg
100731 0243089 viewsWOE type iron ore waggon WOE 33395 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-100 and fleet number 894 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02431.jpg
100731 0243172 viewsWOE type iron ore waggon WOE 33466 is one of a batch of one hundred and twenty eight built by United Group Rail WA between August 2008 and March 2009 with serial number 950211-008 and fleet number 8964 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02432.jpg
100731 0243270 viewsWOE type iron ore waggon WOE 33412 is one of a batch of one hundred and forty one built by United Group Rail WA between November 2005 and April 2006 with serial number 950142-117 and fleet number 8911 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02433.jpg
100731 0243372 viewsWOC type iron ore waggon WOC 31343 is one of a batch of thirty built by Goninan WA between October 1997 to January 1998 with fleet number 403 for Koolyanobbing iron ore operations with a 75 ton capacity, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02434.jpg
100731 0243471 viewsWOC type iron ore waggon WOC 31351 is one of a batch of thirty built by Goninan WA between October 1997 to January 1998 with fleet number 411 for Koolyanobbing iron ore operations with a 75 ton capacity, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02435.jpg
100731 02435105 viewsWOB type iron ore waggon WOB 31383 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 308 for Koolyanobbing iron ore operations, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02436.jpg
100731 0243674 viewsWOC type iron ore waggon WOC 31347 is one of a batch of thirty built by Goninan WA between October 1997 to January 1998 with fleet number 407 for Koolyanobbing iron ore operations with a 75 ton capacity, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02437.jpg
100731 0243778 viewsWO type iron ore waggon WO 31210 is one of a batch of eighty six built by WAGR Midland Workshops between 1967 and March 1968 with fleet number 106 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on empty train 6418 at Binduli Triangle, 31st July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
100731_02438.jpg
100731 0243868 viewsWO type iron ore waggon WO 31260 is one of a batch of sixty two built by Goninan WA between April and August 2000 with serial number 950086-010 and fleet number 146 for Koolyanobbing iron ore operations, and is a Goninan built replacement WO type waggon that replaces the original WAGR built WO type waggon with the newer style WOD type and has square features opposed to the curved ones as on the original WO class, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02439.jpg
100731 0243988 viewsWOB type iron ore waggon WOB 31386 is one of a batch of twenty five built by Comeng WA between 1974 and 1975 and converted from Mt Newman high sided waggons by WAGR Midland Workshops with a capacity of 67 tons with fleet number 311 for Koolyanobbing iron ore operations. This waggon was also converted to a WSM type ballast hopper by re-fitting the cut down top section and having bottom discharge doors fitted, converted back to WOB in 1998, on empty train 6418 at Binduli Triangle, 31st July 2010.
100731_02440.jpg
100731 0244087 viewsWOC type iron ore waggon WOC 31359 is one of a batch of thirty built by Goninan WA between October 1997 to January 1998 with fleet number 419 for Koolyanobbing iron ore operations with a 75 ton capacity, on empty train 6418 at Binduli Triangle, 31st July 2010.
1119 files on 56 page(s) 23

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional