Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Western Australian Negative and Digital Albums > 0202

Last additions - 0202
202-33.jpg
202-33114 viewsYandi One, 307 km grade crossing, the last waggons on a loaded train, the last two are both Comeng style waggons, while the third, also being built by Comeng was originally built as a fixed wheel waggon with four axles, later converted to bogies.Aug 16, 2014
202-32.jpg
202-32116 viewsYandi One, 307 km grade crossing, mid-train remote CM40-8ML Goninan GE unit 5663 'Newcastle' serial 8412-08/94-154 was originally built 'cabless' but now fitted with one, also note the difference in the ALCo builds by the fuel tanks, 5666 was originally an M636C built by Comeng while 5663 was originally built by AE Goodwin.Aug 16, 2014
202-31.jpg
202-31124 viewsYandi One, 307 km grade crossing, mid-train remote CM40-8MEFI Goninan GE unit 5666 'Taranto' serial 8412-11/94-157 and CM40-8ML unit 5663 'Newcastle' show the difference in the ALCo builds by the fuel tanks, 5666 was originally an M636C built by Comeng while 5663 was originally built by AE Goodwin.Aug 16, 2014
202-30.jpg
202-3094 viewsYandi One, 307 km grade crossing sees a loaded train departing behind a CM40-8M and an CM40-8 unit with the rail grinder in the back track in the distance, the road curving around at the right goes to the Henry Walker camp.Aug 16, 2014
202-28.jpg
202-2898 viewsMeckering, looking east at the interlocking levers #1 and #2 and Pilot Key box 5B for the goods siding and derail at the east end of the crossing loop.Aug 16, 2014
202-29.jpg
202-2996 viewsYandi One, 307 km grade crossing sees a loaded train departing behind a CM40-8M and an CM40-8 unit with the rail grinder in the back track in the distance.Aug 16, 2014
202-26.jpg
202-2689 viewsMeckering, view looking east across the Mortlock River flood plain at the east end of the crossing loop, the east end only has a small interlocking relay cabinet and phone booth.Aug 16, 2014
202-27.jpg
202-2790 viewsMeckering, looking east at the Down departure signals for the loop 10 RB and the mainline 10 RA.Aug 16, 2014
202-24.jpg
202-2485 viewsMeckering, view looking east with the goods siding re-joining the goods loop and heading back to the crossing loop.Aug 16, 2014
202-25.jpg
202-2590 viewsMeckering, view looking east with the east end catch points and dwarf indicator for the goods loop and rodding heading towards the interlocked ground frame where it re-joins the crossing loop.Aug 16, 2014
202-23.jpg
202-2395 viewsMeckering, warning sign affixed to the goods crane.Aug 16, 2014
202-22.jpg
202-2289 viewsMeckering, manually operated goods loading crane, chain hoist, and loading ramp.Aug 16, 2014
202-21.jpg
202-21161 viewsMeckering, view of the goods shed from the south east end, shows loading platform, ramps and crane.Aug 16, 2014
202-20.jpg
202-20157 viewsMeckering, view of the goods shed from the north east end, shows loading dock and ramps.Aug 16, 2014
202-19.jpg
202-19158 viewsMeckering, looking east with the grain siding joining the goods loop, then with the goods siding branching off to the left, goods shed and crane on the left, station just visible on the right.Aug 16, 2014
202-18.jpg
202-18152 viewsMeckering, looking west along the grain siding, capstan winch for assisting in moving grain waggons, the three loadout spouts for the concrete grain silos with the two overhead bunker loadouts visible beyond them.Aug 16, 2014
202-17.jpg
202-17180 viewsMeckering, looking east, the three loadout spouts for the concrete grain silos, DRIFT sign to indicate the grade when loading waggons, station at right and goods shed visible beyond the loadout.Aug 16, 2014
202-16.jpg
202-16172 viewsMeckering, looking east, grain elevator with loadout dual overhead bunker bins with #1 closet to camera, the goods loop is running to the right of the loadout bin.Aug 16, 2014
202-15.jpg
202-15165 viewsMeckering, looking east with the points for the hand operated non-interlocked points for the goods loop, grain siding continues on the left skirting the bunker and heading under the silo loading spout, while the goods loop bypasses the silos.Aug 16, 2014
202-14.jpg
202-14160 viewsMeckering, view looing east at the catch points and dwarf indicator at the west end of the goods siding, grain bunker and silos with the goods shed and station visible in the distance.Aug 16, 2014
32 files on 2 page(s) 1

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional