Last additions - pr_website |

050624 3368827 viewsGoldsworthy Siding 110.8 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leading long end on a loaded Yarrie ore train assisting CM40-8 5646 past the Sundowner 24th June 2005. Jan 31, 2018
|
|

050624 3346830 viewsGoldsworthy Siding 110.8 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 having just cut off and pulled forward from the Sundowner in the passing track 24th June 2005.Jan 31, 2018
|
|

050624 3327778 viewsGoldsworthy Siding, 110.8 km on the GML sees BHP Billiton Goninan GE rebuild model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy entering the passing siding. 24th June 2005.Jan 31, 2018
|
|

050624 3297767 viewsDe Grey River bridge, 82.9 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy 24th June 2005.Jan 31, 2018
|
|

050624 3268788 viewsBroome Rd grade crossing at the 57.1 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy across the highway 24th June 2005.Jan 31, 2018
|
|

050624 3254775 viewsNode 3 location at the 51 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy passes the node cabin 24th June 2005.Jan 31, 2018
|
|

050624 3249786 viewsTabba Tabba Creek, 46.5 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy on top of the bridge 24th June 2005.Jan 31, 2018
|
|

050624 3237786 viewsAllan Siding, 45 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy raising the dust running along the resleepered and tamped section 24th June 2005.Jan 31, 2018
|
|

050624 3220812 viewsAllan Siding, 40.2 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy past a 25 kph speed restriction 24th June 2005.Jan 31, 2018
|
|

050624 3202815 viewsPippingarra West Creek bridge, 23 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy 24th June 2005.Jan 31, 2018
|
|

050624 3197875 viewsPort Hedland, the 19.3 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner across the Broome Rd crossing on its way to Goldsworthy 24th June 2005.Jan 31, 2018
|
|

54991415 viewsNelson Point, Mt Newman Mining Comeng NSW built ALCo M636 model locomotive 5499 serial C6096-4 is the last active ALCo on the roster of BHP 22nd April 2000.Jan 30, 2018
|
|

041119 163700r2627 viewsNelson Point, this Pilbara Power Parade shot shows all current liveries used by BHP Billiton. From the undercoat on 3085, the IC&E blue and yellow on 3080, the old corporate colours of BHP, blue and white, on 6074 and 5667 and the new Steve Malpass designed 'bubble' scheme, shown here on units 3092, 5639 and 5636. 19th of November 2004.Jan 30, 2018
|
|

041119 163032r2416 viewsNelson Point, how is this for a Parade of Pilbara Power? On the afternoon of Friday the 19th of November 2004 a photo was managed with no less than fourteen locos in the shot, seven at the workshops, and seven on trains at the car dumper roads. Locos in the frame are: 3085, 3080, 3092, 5639, 5636, 5667, 6074 at the workshops and, 6073, 3082, 3079, 5640, 5669, 3078, and 5630 on the car dumper roads. Models are EMD SD40R and SD40-2, GE AC6000 and Goninan GE CM40-8M.Jan 30, 2018
|
|

041119 162246r2572 viewsNelson Point, a Pilbara Power Parade line-up of (from l to r) of EMD SD40-2 3085, EMD SD40R 3080, 3092, GE AC6000 6074, Goninan GE CM40-8M 5667 and 5640. Seen out the front of the Locomotive Overhaul Shop on Friday 19th November 2004.Jan 30, 2018
|
|

040812 123214r1038 viewsYarrie line 148 km, east of Taplin, BHP Billiton Goninan GE rebuild CM40-8M 5639 'Corunna Downs' serial 8281-03/92-128 works a 'mixed' of 12 ballast and 10 loaded GML waggons towards Hedland following a derailment further out near the Yarrie Mine, 1230 hrs 12th August 2004.Jan 26, 2018
|
|

040812 155940r1010 viewsGoldsworthy Junction BHP Billiton Goninan GE rebuild CM40-8M 5639 'Corunna Downs' serial 8281-03/92-128 is on the Yarrie line with a mixed ballast and loaded ore train awaiting a Pilot to come out from Hedland to pilot the train into Nelson Point yard at 1600 hrs 12th August 2004.Jan 26, 2018
|
|

040807 121312r962 viewsNelson Point freshly delivered BHP Billiton EMD SD40R unit 3095 serial 33677 frame 7083-7 and originally Southern Pacific SD40 SP 8485 is being shunted by Track Mobile #2 7th August 2004.Jan 26, 2018
|
|

060414 3465r1122 viewsNelson Point, BHP Billiton yard pilot locos EMD SD40 3080 serial 33674 frame 7083-4 originally Southern Pacific SD40 SP 8482 and only 3000 hp shares the yard with GE AC6000 6076 'Mt Goldsworthy' serial 51068 and at 6000 hp is double 3080's size, between shunts 15th April 2006.Jan 25, 2018
|
|

050319 0082r1303 viewsNelson Point, Ex Southern Pacific SD40T-2 loco 8335 serial 786175-9 built in April 1979 and retired by Union Pacific 23rd May 2001, this unit was purchased as a spares source for the other SD40 style units. The T signifies that it is a Tunnel motor with a modified radiator intake to allow 'cool' running through the Sierra Nevada tunnels. And the 'M' with a lighting rod through it meant that it was a master unit for radio controlled helpers, used in the Tehachapi mountains. 19th March 2005.Jan 25, 2018
|
|
| 349 files on 18 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
14 |  |
 |
 |
|