Last additions - 0103 |

103-17642 viewsWahgunyah station yard overview, super phosphate sheds on the left track, portable station building in middle of frame, silos in distance, scotch block and point levers in foreground.Aug 12, 1990
|
|

103-16633 viewsWahgunyah portable station building, staff hut, 3/4 view, LHS showing ablution block.Aug 12, 1990
|
|

103-15598 viewsWahgunyah portable station building, staff hut, 3/4 view, super phosphate shed and unloading contraption in the background.Aug 12, 1990
|
|

103-14637 viewsRutherglen station building rear overview, now restored and occupied by the local Lions Club.Aug 12, 1990
|
|

103-13592 viewsRutherglen, portable station building, staff hut, 3/4 view.Aug 12, 1990
|
|

103-12597 viewsRutherglen, portable station building, staff hut, front view.Aug 12, 1990
|
|

103-11629 viewsRutherglen, remains of gangers hut, not turntable pivot in middle of broad gauge rails.Aug 12, 1990
|
|

103-10609 viewsSpringhurst station yard view looking north, mainline points on No.2 Rd for the Wahgunyah line have been spiked and clipped normal, standard gauge flyover on right, yard being rationalised, note redundant disc signal post 5 on ground.Aug 12, 1990
|
|

103-09627 viewsSpringhurst, semaphore signal post 4 with the top of the dolls cut off and the signal for the Wahgunyah line, standard gauge flyover on bank, point rodding, looking south from No.2 Rd.Aug 12, 1990
|
|

103-08584 viewsSpringhurst station yard view, staff exchange platform, elevation from access stairs, platform on the left and silo complex on the right, between No.2 and 3 Roads.Aug 12, 1990
|
|

103-07605 viewsSpringhurst V/Line broad gauge Plasser 07-16B Production Tamper or track tamper with V/Line asset number 6-52-013, an unidentified ballast regulator and a Tamper CSC-2 crib and shoulder compactor with V/Line asset number 6-57-008, track machines.Aug 12, 1990
|
|

103-06639 viewsSpringhurst V/Line broad gauge Plasser 07-16B Production Tamper or track tamper with V/Line asset number 6-52-013.Aug 12, 1990
|
|

103-05612 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge, signal levers visible in windows, staff exchange box on station wall.Aug 12, 1990
|
|

103-04627 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge, signal levers visible in windows, staff exchange box on station wall.Aug 12, 1990
|
|

103-03619 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge laying on No.3 Rd.Aug 12, 1990
|
|

103-01600 viewsSpringhurst automatic staff exchanger cover in-between broad gauge running lines, point rodding under tracks.Aug 12, 1990
|
|

103-02622 viewsSpringhurst yard view, staff exchange platform, auto exchanger cover, point rodding, tamper, silo complex and bunker, loading platform.Aug 12, 1990
|
|
|
|
|
|
|