Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
256-06.jpg
256-06184 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
256-05.jpg
256-05163 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
256-04.jpg
256-04183 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-03.jpg
256-03170 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-02.jpg
256-02160 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-01.jpg
256-01179 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
WTT_Combined_Regions_General-Instructions_1986-11-11_.pdf
WTT Combined Regions General-Instructions 1986-11-11 291 viewsGeneral Instructions for the Combined Regions working timetable 11th November 1986.
Complete 154 pages, 15.5 MB download.
Sep 25, 2021
WTT_Combined_Regions_1987-10-11_.pdf
WTT Combined Regions 1987-10-11 261 viewsCombined Regions working timetable 11th October 1987.
Complete 123 pages, 13 MB download.
Sep 24, 2021
WTT_Addenda_MET-Trains_1997-02-17.pdf
WTT Addenda MET-Trains 1997-02-17263 viewsMET Trains Working Timetable Addenda 17th February 1997.
Complete 96 pages, 13.1 MB download.
Sep 24, 2021
WTT_Mildura_Diesel_1953_16-53.pdf
WTT Mildura Diesel 1953 16-53249 viewsInauguration of Diesel-Electric Operation of Melbourne - Mildura
Monday 16th March 1953.
18 pages PDF download 9.7 MB.
Sep 19, 2021
255-37.jpg
255-37182 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line joining the East Mainline, the mileage is 76.3 km on the Robe and 78.4 on the HI. The interconnecting line branches off the Robe River Cape Lambert to Deepdale line at the 71.1 km. Geodata location here. May 2002.Sep 12, 2021
255-36.jpg
255-36177 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line on the left joining the HI Tom Price line. Train Control board for crews to change channels. May 2002.Sep 12, 2021
255-35.jpg
255-35211 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line on the left joining the HI Tom Price line. Train Control board for crews to change channels. May 2002.Sep 12, 2021
255-34.jpg
255-34163 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line on the right heading around to join the Cape Lambert to Deepdale line. Train Control board for crews to change channels. May 2002.Sep 12, 2021
255-33.jpg
255-33175 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425, 9410, 9420 and 9414 with serial number 8206-11 / 91-124. The Western Creek interconnecting line can be seen branching off to the right. Geodata location here. May 2002.Sep 12, 2021
255-32.jpg
255-32175 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425, 9410, 9420 and 9414 with serial number 8206-11 / 91-124. The Western Creek interconnecting line can be seen branching off to the right. Geodata location here. May 2002.Sep 12, 2021
255-31.jpg
255-31191 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425, 9410, 9420 and 9414 with serial number 8206-11 / 91-124. The Western Creek interconnecting line can be seen branching off to the right. Geodata location here. May 2002.Sep 12, 2021
255-30.jpg
255-30184 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 and 9410 with serial number 2160-03 / 96-202. The Western Creek interconnecting line can be seen branching off to the right. Geodata location here. May 2002.Sep 12, 2021
255-29.jpg
255-29175 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 with serial number 6266-08 / 89-85. Geodata location here. May 2002.Sep 12, 2021
255-28.jpg
255-28178 viewsWestern Creek at the 71 km on the Cape Lambert to Deepdale line an empty Robe River train powers upgrade as it heads to Mesa J for loading behind the standard quad CM40-8M lash up led by Goninan CM40-8M unit 9425 with serial number 6266-08 / 89-85 and sisters 9410, 9420 and 9414. Geodata location here. May 2002.Sep 12, 2021
16913 files on 846 page(s) 118

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional