Last additions |

180527 1207191 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP has stored some redundant service waggons, flat waggon AQPY 2916 , the two heavy weight waggons, the old winch and crib waggons from the steel train and Difco side dumps. Looking west. 27th May 2018. GeoData.Jun 24, 2018
|
|

180527 1200658 viewsPippingarra, near the 17 km on the former Goldsworthy line, BHP has stored some redundant service waggons, Difco side dumps, a couple of heavy weights and the old winch and crib waggons from the steel train. Looking east with a former GML short Difco side dump waggon on the end. 27th May 2018. GeoData.Jun 24, 2018
|
|

180208 4372390 viewsCape Lambert Yard. Rear view of brand new GE built ES44ACi unit 9126 serial 64632 built date of October 2017 in the owners Rio Tinto stripe livery. 8th February 2018.
Roland Depth image.Jun 24, 2018
|
|

180208 43716882 viewsCape Lambert Yard. Brand new GE built ES44ACi unit 9126 serial 64632 built date of October 2017 in the owners Rio Tinto stripe livery. 8th February 2018.
Roland Depth image.Jun 24, 2018
|
|

180208 4370232 viewsCape Lambert Yard. Builders decal of brand new GE built ES44ACi unit 9126 serial 64632, built date of October 2017. 8th February 2018.
Roland Depth image.Jun 24, 2018
|
|

180117 1151214 viewsGreat Northern Highway, between the 18 and 18.2 km grade crossings sees Roy Hill loaded fuel train with General Electric built ES44ACi units RHA 1018 serial 63829 leading RHA 1019, CFCLA lease unit Goninan ALCo to GE rebuild CM40-8M unit CD 4302 and RHA 1013 with eleven loaded fuel tank waggons. CD 4302 is the only unit powering as it was being tested prior to mainline service. 17th January 2018.Jun 24, 2018
|
|

180117 1146659 viewsGreat Northern Highway, 18 km grade crossing sees Roy Hill loaded fuel train with General Electric built ES44ACi units RHA 1018 serial 63829 leading RHA 1019, CFCLA lease unit Goninan ALCo to GE rebuild CM40-8M unit CD 4302 and RHA 1013 with eleven loaded fuel tank waggons. CD 4302 is the only unit powering as it was being tested. 17th January 2018.Jun 24, 2018
|
|

180117 1148381 viewsGreat Northern Highway, 18 km grade crossing sees CFCLA Goninan ALCo to GE rebuild CM40-8M unit CD 4302 originally Robe River Comeng NSW built ALCo M636 serial C6103-1 #9421, rebuilt by Goninan in 1993 with serial 8297-2/93-137 then to CFCLA in 2012 powering a loaded fuel train as part of the mainline testing of these units prior to ore train service. 17th January 2018.Jun 24, 2018
|
|

091224 3392r655 viewsChristmas Eve at Crossing Pool, Wittenoom 2009.Apr 28, 2018
|
|

081010 0017r500 viewsThe closest Toy Titan has got to being indoors, car ported next to a Rangie at Cullen Bay, NT 10th Oct 2008.Apr 28, 2018
|
|

140603 0700r679 viewsHere's the Troopy at the panel shop with the mudguard and fender removed showing the relays and engine bay. June 2014.Apr 28, 2018
|
|

140603 0699r615 viewsHere's the Troopy at the panel shop with a complete new LHS panel viewed from the back, I'm talking to Keith from the panel shop. June 2014.Apr 28, 2018
|
|

140603 0697r703 viewsHere's the Troopy at the panel shop with a complete new LHS panel. June 2014.Apr 28, 2018
|
|

140603 0698r602 viewsHere's the Troopy at the panel shop with a complete new LHS panel, that's the new fender and mudguard inside the car. June 2014.Apr 28, 2018
|
|

140317 0564r761 viewsHere's the Troopy at home showing the extensive damage that a little tree out Wittenoom way did, March 2014.Apr 28, 2018
|
|

090912 2289r1388 viewsIndee, at the 48.5 km grade crossing for Indee Road, FMG General Electric built Dash 9-44CW units 003 serial 58180 and 004 serial 58181 power another loaded train from the Cloud Break mine under Proceed Authority 54 in the last rays of sunlight on the 12th September 2009.Apr 25, 2018
|
|

090912 2277r908 viewsBoodarie, at the entrance to the Herb Elliot port car dumper balloon loop the final unit of FMG's 15 General Electric built Dash 9-44CW locos 015 serial 58192 with compressor set 9003-9004 shunts from the loaded waggon line to the empty waggon line at the 4.2 km under Proceed Authority 57 to make way for the incoming loaded train. 12th September 2009.Apr 25, 2018
|
|

090912 2249r867 viewsBoodarie, at the 5 km curve between the Great Northern Highway and the car dumper balloon FMG General Electric built Dash 9-44CW light engines 009 serial 58186 and class leader 001 serial 58178 return to the port under Proceed Authority 56 following refuelling at Rowley Yard. 12th September 2009.Apr 25, 2018
|
|

090814 2138r954 viewsWoodstock, FMG General Electric built Dash 9-44CW locomotives 002 serial 58179 and 012 serial 58189 power their loaded train through the cutting at the 145 km area near the Marble Bar Rd grade crossing. 14th August 2009.Apr 25, 2018
|
|

090814 2109r684 viewsHunter Siding, the empty train takes the passing track under the power of two FMG General Electric built Dash 9-44CW units 011 serial 58188 and 010 serial 58187, while another pair of identical units 002 serial 58179 and 012 serial 58189 hold the mainline and will wait for a new PA to continue towards the port. The dust between the two trains is from the BHP access road. 14th August 2009.Apr 25, 2018
|
|
16558 files on 828 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
160 |  |
 |
 |
 |
 |
 |
 |
|