Last additions |

030726 121315r925 viewsNelson Point Loco Overhaul Workshop sees BHP Billiton Goninan GE build CM39-8 unit 5632 'Poseidon' serial 5831-11 / 88-081 as it waits for a new engine. Although this was the first unit painted, sister loco 5639 saw the first mainline working of the new scheme to Yandi. This shot was taken on Saturday 26th July 2003.Feb 02, 2018
|
|

040802 141058r588 viewsGoldsworthy Junction, BHP Billiton Goninan GE built CM39-8 5632 'Poseidon' serial 5831-11 / 88-081 in charge of the 'Recycle Rake' is traversing the Transfer Road, this train conveys ore from Nelson Point to Finucane Island, sometimes twice a day. The line to the right is the line to the Junction, Yarrie and Bing. 1410 hrs 2nd August 2004.Feb 02, 2018
|
|

040801 172236r658 viewsBoodarie, 5631 'Apollo' serial 5831-10 / 88-080 leading a loaded Yarrie train thunders around the curve between Boodarie Yard and Finucane Island bound for the FI rotary dumper at 1722 hrs 1st August 2004.Feb 02, 2018
|
|

041001 152919r725 viewsRedbank Bridge, BHP Goninan GE rebuild CM40-8M 5650 'Yawata' serial 8412-07 / 93-141 notches back up into power as it passes the examiner doing his 'roll by' entering Nelson Point yard as a Doug Gould road train passes over the top. A very rare shot indeed! 1530 hrs 1st October 2004.Feb 02, 2018
|
|

040817 194500r753 viewsNelson Point, BHP Billiton Goninan GE CM39-8 unit 5630 'Zeus' serial 5831-09 / 88-079 class leader of a batch of four new built units, 5630 ended up travelling 4,940,000 km when retired. Here it idles away next to TSB 2 building awaiting a path out of Nelson Point yard with the 'Recycle Rake' bound for the dumper at Finucane Island 1945 hrs 17th August 2004.Feb 02, 2018
|
|

050101 170643r829 viewsGillam Siding BHP Goninan GE rebuild CM40-8M 5637 'De Grey' serial 8181-01 / 92-123 leading a pair of EMD SD40R units 3087 and 3091 comes to a stand under the control of driver Jacka Cale behind another train already holding the main and an empty taking the passing track. Double crosses were not that uncommon during this era. 1st January 2005.Feb 02, 2018
|
|

060415 3450r675 viewsNelson Point yard, BHP Goninan GE rebuild CM40-8M 5659 'Kobe' serial 8412-04 / 94-150 with a rake of loaded 100 kL fuel waggons waiting access to shunt for the evening departure and Yard Pilots EMD SD40 units 3080 and 3091 15th April 2006.Feb 02, 2018
|
|

060714 6685r665 viewsBing Siding finds BHP Goninan GE rebuild CM40-8M locomotive 5654 'Kashima' serial 8412-11 / 93-145 as it shunts the steel (rail) train 14th July 2006.Feb 02, 2018
|
|

060714 6721r592 viewsHesta, 226 km sees BHP Goninan GE rebuild CM40-8M 5657 'Fukuyama' serial 8412-02 / 94-148 with EMD SD40-2 3081 and SD40R 3089 as they struggle upgrade with a loaded Yandi train, mid-train remote units visible are a pair of EMD SD70ACe/LC locos 4302 and 4311 14th July 2006.Feb 02, 2018
|
|

081217 0448r627 viewsWoodstock Siding BHP Goninan GE rebuild and former cab-less CM40-8ML unit 5665 'Rotterdam' serial 8412-10 / 94-156 runs along the mainline with the rail or steel train under the FMG flyover. It is not uncommon to see long hood leading units on BHP work trains. 17th December 2008.Feb 02, 2018
|
|

080621 2703r715 viewsTabba Siding, BHP Billiton Goninan GE rebuild CM40-8M unit 5637 'De Grey' serial 8181-01 / 92-123 leads EMD SD70ACe/LC unit 4312 'Mindy' serial 20038540-013 with a loaded train from Mount Whaleback with the FMG line visible on the right 21st June 2008.Feb 02, 2018
|
|

090112 0725r688 viewsGoldsworthy Junction, 19.3 km grade crossing on the GML sees BHP Goninan GE rebuild CM40-8M locomotive 5653 'Chiba' serial 8412-10 / 93-144 with an empty Yarrie train 12th January 2009.Feb 02, 2018
|
|

081225 0510r700 viewsWalla Siding, BHP Billiton Goninan GE rebuild CM40-8M unit 5638 'Mallina' serial 8151-11 / 91-122 powers through on the mainline with EMD SD70ACe 4325 serial 20066862-038 with a similar mid-train DPU consist on this Yandi 220 waggon loaded train bound for Port Hedland on a hazy Christmas Day 2008.Feb 02, 2018
|
|

050625 3840527 viewsGoldsworthy Junction, BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading runs off the Goldsworthy or GML line past signal GJ 2 onto the Newman mainline with the Sundowner on its return to Hedland 25th June 2005.Jan 31, 2018
|
|

050625 3834505 viewsPippingarra near the 31 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.Jan 31, 2018
|
|

050625 3829475 viewsNode #2 at the 38 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.Jan 31, 2018
|
|

050625 3822398 viewsNode #2 at the 38 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.Jan 31, 2018
|
|

050625 3801429 viewsAllan Siding at the 46 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main as it crosses 5630 'Zeus' on an empty train refuged in the passing track while returning to Hedland 25th June 2005.Jan 31, 2018
|
|

050625 3797433 viewsAllan Siding at the 46 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner along the main on its return to Hedland 25th June 2005.Jan 31, 2018
|
|

050625 3788441 viewsTabba Tabba Creek bridge at the 48 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its return to Hedland 25th June 2005.Jan 31, 2018
|
|
16589 files on 830 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
176 |  |
 |
 |
 |
 |
 |
 |
|