Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
050625_3784.jpg
050625 3784421 viewsAllan Siding, at the 51 km just east of Node 3 on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner waiting for an empty train to pull in clear into the siding on its way back to Hedland 25th June 2005.Jan 31, 2018
050625_3779.jpg
050625 3779414 viewsDe Grey at the 54 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its way back to Hedland 25th June 2005.Jan 31, 2018
050625_3768.jpg
050625 3768442 viewsBroome Rd grade crossing at the 57.1 km on the GML sees BHP Goninan GE rebuilt model CM40-8M unit 5648 'Kwangyang Bay' serial 8412-06 / 93-139 long end leading the Sundowner on its way back to Hedland across the highway 25th June 2005.Jan 31, 2018
050624_3371.jpg
050624 3371463 viewsGoldsworthy Siding 110.8 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leading long end on a loaded Yarrie ore train assisting CM40-8 5646 past the Sundowner set up for the Black Rock Stakes 24th June 2005.Jan 31, 2018
050624_3368.jpg
050624 3368461 viewsGoldsworthy Siding 110.8 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leading long end on a loaded Yarrie ore train assisting CM40-8 5646 past the Sundowner 24th June 2005. Jan 31, 2018
050624_3346.jpg
050624 3346464 viewsGoldsworthy Siding 110.8 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 having just cut off and pulled forward from the Sundowner in the passing track 24th June 2005.Jan 31, 2018
050624_3327.jpg
050624 3327392 viewsGoldsworthy Siding, 110.8 km on the GML sees BHP Billiton Goninan GE rebuild model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy entering the passing siding. 24th June 2005.Jan 31, 2018
050624_3297.jpg
050624 3297419 viewsDe Grey River bridge, 82.9 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy 24th June 2005.Jan 31, 2018
050624_3268.jpg
050624 3268441 viewsBroome Rd grade crossing at the 57.1 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy across the highway 24th June 2005.Jan 31, 2018
050624_3254.jpg
050624 3254414 viewsNode 3 location at the 51 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy passes the node cabin 24th June 2005.Jan 31, 2018
050624_3249.jpg
050624 3249438 viewsTabba Tabba Creek, 46.5 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy on top of the bridge 24th June 2005.Jan 31, 2018
050624_3237.jpg
050624 3237442 viewsAllan Siding, 45 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy raising the dust running along the resleepered and tamped section 24th June 2005.Jan 31, 2018
050624_3220.jpg
050624 3220462 viewsAllan Siding, 40.2 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy past a 25 kph speed restriction 24th June 2005.Jan 31, 2018
050624_3202.jpg
050624 3202478 viewsPippingarra West Creek bridge, 23 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner on its way to Goldsworthy 24th June 2005.Jan 31, 2018
050624_3197.jpg
050624 3197527 viewsPort Hedland, the 19.3 km on the GML sees BHP Billiton Goninan GE rebuilt model CM40-8M unit 5636 'Munda' serial 8151-11 / 91-122 leads the Sundowner across the Broome Rd crossing on its way to Goldsworthy 24th June 2005.Jan 31, 2018
5499.jpg
54991065 viewsNelson Point, Mt Newman Mining Comeng NSW built ALCo M636 model locomotive 5499 serial C6096-4 is the last active ALCo on the roster of BHP 22nd April 2000.Jan 30, 2018
240-13.jpg
240-13188 viewsWickham, town entry statement with former Robe River Iron Associates Montreal Locomotive Works (MLW) built ALCo model RSC3 serial 77737 of 1951, originally owned by New South Wales Railways as their 40 class 4006, to Robe River in 1971 as 261.001, then 1700 and finally 9401. View on the rail plinth at the entry into town. 31st August 2002.Jan 30, 2018
240-12.jpg
240-12146 viewsWickham town entry statement, concrete plinth with plaque outlining the history of the MLW built ALCo model RSC3 units operated by Robe River prior to preservation. 31st August 2002.Jan 30, 2018
240-11.jpg
240-11167 viewsWickham, town entry statement with former Robe River Iron Associates Montreal Locomotive Works built ALCo model RSC3 serial 77737 of 1951, originally owned by New South Wales Railways as their 40 class 4006, to Robe River in 1971 as 261.001, then 1700 and finally 9401. Short hood end view on the rail plinth at the entry into town. 31st August 2002Jan 30, 2018
240-10.jpg
240-10128 viewsNelson Point, retired Mt Newman Mining Comeng NSW built ALCo M636 unit 5499 serial C6096-4 sits awaiting its engine removal prior to being sent by road to Rail Heritage WA's Museum at Bassendean, Perth for preservation. 25th June 2002.Jan 30, 2018
16589 files on 830 page(s) 177

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional