Last additions |

060416 3478r797 viewsNelson Point Locomotive Service Shop, BHP Billiton's class leader of the Electro-Motive built SD70ACe/LC locomotive 4300 serial 20038540-001 which was actually purchased as a spare parts source, sits in the shed during commissioning, of note is that it has no windscreen protectors fitted. 16th April 2006. This unit was subsequently stripped and then the frame and cab eventually scrapped in January 2016 without ever hauling a train.Mar 21, 2018
|
|

060719 7279r753 viewsNelson Point, BHP Billiton examples of Electro-Motive built old and new motive power in the form of SD70ACe/LC unit 4307 'Shaw' serial 20038540-008 and SD40R unit 3095 serial 33677 / 7083-7. 19th July 2006.Mar 21, 2018
|
|

060714 6737r735 viewsHesta, a brace of BHP Billiton Electro-Motive built SD70ACe/LC mid-train units 4302 'Mooka' serial 20038540-003 and 4311 'Poonda' serial 20038540-012 are in full power as they assist a loaded train climbing the grade at the 226 km. 14th July 2006.Mar 21, 2018
|
|

060710 6265r688 viewsBoodarie, BHP Billiton's Electro-Motive built SD70ACe/LC locomotive 4304 'Gillam' serial 20038540-005, these original fourteen units, 4301-4313 had the non-isolated cab and were later traded back to Progress Rail for new units. 10th July 2006.Mar 21, 2018
|
|

060710 6277r734 viewsBoodarie Yard, BHP Billiton Electro-Motive built SD70ACe/LC unit 4309 serial 20038540-010 and CM40-8M 5638 shunt through the yard during commissioning trials of Car Dumper 4 at Finucane Island. Boodarie Yard has just been expanded and the fence has since been put back up. 10th July 2006. Several years later both these locos and the HBI Plant in the background would all be gone!Mar 21, 2018
|
|

081225 0720r956 viewsTurner North on Christmas Day 2008 sees the first BHP Billiton Electro-Motive built SD70ACe 'Pumpkin' unit 4332 serial 20066862-061, originally built for BNSF, to be fitted out as a lead unit. This cab shot shows some of the external modifications to allow it to lead. In-fill step covers, second handrail, second (tropical) roof, bifurcation of main air line, AM/FM CD player-radio and removal of sun shades.Mar 21, 2018
|
|

081225 0713r950 viewsTurner North, at the 111 km of the first bit of duplicated mainline and the first BHP Billiton Electro-Motive built SD70ACe 'Pumpkin' 4332 serial 20066862-061 that has been modified to lead unit status shows some of the external modifications undertaken, step in-fill covers, second handrail, air dryer, remote uncoupling, bifurcation of main air line and second painted snow plough. 25th December 2008.Mar 21, 2018
|
|

081225 0533r917 viewsWalla Siding on Christmas Day 2008, BHP Billiton Electro-Motive built SD70ACe mid train unit 4324 serial 20066862-037, this is the 'class leader' of a batch of ten SD70ACe units built for BNSF but sold to BHP Billiton following construction. Note the difference of this cab shot to the one of lead unit capable 4332.Mar 21, 2018
|
|

081225 0501r670 viewsWalla Siding on Christmas Day 2008 see an empty 224 waggon train powered by BHP Billiton Electro-Motive built SD70ACe/LC unit 4318 serial 20058712-005 leading CM40-8M unit 5654 running along the passing track to allow a meet with a loaded train, the back track is on the right.Mar 21, 2018
|
|

080621 2783r644 viewsTabba Siding at the 83.4 km crossing, the final member of the original BHP Billiton order for thirteen Electro-Motive built SD70ACe/LC units 4313 serial 20038540-014 leads CM40-8M 5653 with a loaded 330 waggon train from Yandi 2 mine. Other locos in the consist are two set of mid train units consisting of CM40-8M-SD40R-SD40R and CM40-8-SD40R-SD40R. 21st June 2008.Mar 21, 2018
|
|

080614 2605748 viewsNelson Point hard stand sees BHP Billiton's latest Electro-Motive SD70ACe unit 4331 serial 20066862-060 originally built for BNSF as BNSF 9189 in all over BNSF orange referred to as 'pumpkins'. A 300 tonne crane on the left and an even bigger 500 tonne crane combine to lift the 200 tonne mass of the 4300 hp SD70ACe locomotive, 14th June 2008.Mar 20, 2018
|
|

080612 2546683 viewsNelson Point, the first BHP Billiton Electro-Motive built SD70ACe 'Pumpkin' unloaded off the heavy lift ship DA QIANG on Thursday 12th June 2008. The crane behind the loco is for removing the tarp the other two are a 300 tonne on the left an a massive 500 tonne on the right.Mar 20, 2018
|
|

080614 2629948 viewsPort Hedland, Gilbert Street, the last BHP Billiton Electro-Motive built SD70ACe 'Pumpkin' 4328 serial 20066862-057 and originally destined to be BNSF 9186 is turning into Gate 9 after being unloaded off the heavy lift ship DA QIANG Saturday 14th June 2008.Mar 20, 2018
|
|

080614 2611788 viewsPort Hedland, Gilbert Street, brand new BHP Billiton Electro-Motive built SD70ACe 'Pumpkin' 4333 serial 20066862-062 is turning into Gate 9 and is the final unit in a ten unit order that was built originally for BNSF prior to BHP purchasing them. Thus proving an off the self US unit is suitable for Australia. Saturday 14th June 2008.Mar 20, 2018
|
|

070415 8861813 viewsNelson Point Locomotive Overhaul Workshop, right hand side view of BHP Billiton Electro-Motive built SD70ACe/LC loco 4318 serial 20058712-005 with isolated cab. Of note is the vertical sand filler on the nose compared to the original order, 15th April 2007.Mar 20, 2018
|
|

070415 8847823 viewsNelson Point Locomotive Overhaul Workshop, left hand side view of BHP Billiton Electro-Motive built SD70ACe/LC unit 4315 serial 20058712-002 with isolated cab. BHP bought the first SD70ACe type locomotives with this feature and as such loco 4314 was sent for testing at the Pueblo Test Track in the USA. 14th April 2007.Mar 20, 2018
|
|

070414 8774839 viewsNelson Point Locomotive Overhaul Workshop, brand new BHP Billiton Electro-Motive built SD70ACe/LC unit 4314 serial 20058712-001 during 'fit out' work by EDI 14th April 2007.Mar 20, 2018
|
|

070402 8697765 viewsNelson Point Locomotive Service Shop see brand new BHP Billiton's Electro-Motive built SD70ACe/LC unit 4314 serial 20058712-001, this first of a batch of ten to have the Electro-Motive 'Whisper' or isolated cab. BHP Billiton bought the first SD70ACe type locomotive with this feature, and as such this loco was sent for testing to the Pueblo Test Track in the USA prior to delivery. EDI personnel are fitting the unit out since arriving only the day before. 2nd April 2007.Mar 20, 2018
|
|

070414 8758875 viewsNelson Point Locomotive Overhaul Workshop, brand new line up of BHP Billiton Electro-Motive built SD70ACe/LC units during fitting out by EDI with 4314 serial 20058712-001. Note the bolt on lashing points for shipping, 14th April 2007.Mar 20, 2018
|
|

090114 0879808 viewsPort Hedland, Electro-Motive built SD70ACe/LC loco 4342 serial 20078915-009 turns off Gilbert Street and into Nelson Point via Gate 9 14th January 2009.Mar 19, 2018
|
|
16911 files on 846 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
186 |  |
 |
 |
 |
 |
 |
 |
|