Last additions |
![Filename=060715_6948.jpg
Filesize=427KiB
Dimensions=1280x853
Date added=Nov 03, 2017 060715_6948.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_060715_6948.jpg)
060715 694898 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's. These are built on former ore waggons that have been cut down. Seen here just outside of 7 Mile. 15th July 2006.Nov 03, 2017
|
|
![Filename=060715_6949.jpg
Filesize=424KiB
Dimensions=1280x853
Date added=Nov 03, 2017 060715_6949.jpg](albums/Pilbara/Rio_Tinto_Rolling_Stock_-_non_ore/thumb_060715_6949.jpg)
060715 694988 viewsRio Tinto compressor waggon set CB 03, compressor control waggon with two diesel powered Atlas Copco XAS 97's behind the loco and the receiver waggon with two air tanks or receivers closet to camera. Note the waggons are cut down ore waggons. Seen here just outside of 7 Mile. 15th July 2006.Nov 03, 2017
|
|
![Filename=170730_0701.jpg
Filesize=327KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0701.jpg](albums/Pilbara/07-2017/thumb_170730_0701.jpg)
170730 0701205 viewsPippingarra, out near the speedway CFCLA CD class lease units sit stored in between hire jobs in a lay down / hardstand yard. CD 4303 and CD 4305 with CD 4302 and CD 4301 behind them. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0589.jpg
Filesize=415KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0589.jpg](albums/Pilbara/07-2017/thumb_170730_0589.jpg)
170730 058994 viewsIndee, at the 55 km on the BHP line a loaded train from Yandi is heading north behind mid-train unit Electro-Motive London Ontario built SD70ACe/LC unit 4338 'Pepper' with 4481. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0528.jpg
Filesize=476KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0528.jpg](albums/Pilbara/07-2017/thumb_170730_0528.jpg)
170730 0528101 viewsIndee, at the 55 km on the BHP line a loaded train from Yandi is heading north behind Progress Rail Muncie USA built SD70ACe/LCi unit 4400 serial 20118575-010 with second unit 4348. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0523.jpg
Filesize=401KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0523.jpg](albums/Pilbara/07-2017/thumb_170730_0523.jpg)
170730 052383 viewsMarubeni Siding, located on the Roy Hill railway at the 152.5 to the 155.8 km, view looking south. GeoData.Oct 16, 2017
|
|
![Filename=170730_0518.jpg
Filesize=428KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0518.jpg](albums/Pilbara/07-2017/thumb_170730_0518.jpg)
170730 051894 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port with mid-train remote unit General Electric built ES44ACi unit RHA 1021 serial 64302 sandwiched within 224 waggons. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0513.jpg
Filesize=431KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0513.jpg](albums/Pilbara/07-2017/thumb_170730_0513.jpg)
170730 051389 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port behind General Electric built ES44ACi units RHA 1010 serial 62582 and RHA 1004 with 224 waggons and a mid-train remote in the middle. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0511.jpg
Filesize=412KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0511.jpg](albums/Pilbara/07-2017/thumb_170730_0511.jpg)
170730 051186 viewsIndee, a loaded Roy Hill train runs along at the 71 km heading to the port behind General Electric built ES44ACi units RHA 1010 serial 62582 and RHA 1004 with 224 waggons and a mid-train remote in the middle. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0500.jpg
Filesize=474KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0500.jpg](albums/Pilbara/07-2017/thumb_170730_0500.jpg)
170730 050096 viewsIndee, empty Roy Hill train at the Indee Rd grade crossing at the 53.3 km with mid-train remote General Electric built ES44ACi unit RHA 1015 serial 63826. These mid-train units have 112 waggon before and after. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0492.jpg
Filesize=460KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0492.jpg](albums/Pilbara/07-2017/thumb_170730_0492.jpg)
170730 0492101 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 with 112 waggons, a mid-train unit and another 112 waggons. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0490.jpg
Filesize=444KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0490.jpg](albums/Pilbara/07-2017/thumb_170730_0490.jpg)
170730 049090 viewsIndee, an empty Roy Hill train rounds the curve at the Indee Rd grade crossing at the 53.3 km behind General Electric built double ES44ACi units RHA 1008 serial 62580 and RHA 1018 and 112 waggons, then the mid-train unit and then another 112 waggons. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0482.jpg
Filesize=341KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0482.jpg](albums/Pilbara/07-2017/thumb_170730_0482.jpg)
170730 0482101 viewsIndee, a loaded FMG iron ore train crosses Indee Rd grade crossing at the 48 km as it runs to the port behind NS Juniata Shops rebuild EMD SD90MAC-H unit 903 serial 976833-18 and General Electric built Dash 9-44CW class leader unit 001. 903 had the 245-H engine replaced with a 710 in 2014. The line to the right is the Roy Hill line. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0476.jpg
Filesize=425KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0476.jpg](albums/Pilbara/07-2017/thumb_170730_0476.jpg)
170730 047690 viewsBoodarie, a loaded Roy Hill train crossing the Great Northern Highway grade crossing with mid-train General Electric built ES44ACi unit RHA 1011 serial 62583. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0470.jpg
Filesize=397KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0470.jpg](albums/Pilbara/07-2017/thumb_170730_0470.jpg)
170730 047094 viewsBoodarie, a loaded Roy Hill train approaches the Great Northern Highway grade crossing behind General Electric built ES44ACi units RHA 1013 serial 62585 and sister unit RHA 1014, the third and mid-train unit can be made out at the end of the rack as it curves. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170730_0435.jpg
Filesize=371KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170730_0435.jpg](albums/Pilbara/07-2017/thumb_170730_0435.jpg)
170730 043598 viewsBoodarie, a loaded FMG iron ore train rounds the large curve at the 5 km as it approaches the car dumper balloon loops behind Progress Rail Muncie USA built SD70ACe/LCi unit 719 serial 20118693-011 and sister 704 with the first four waggons showing panel repairs and re-lining recently undertaken. 30th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170729_0415.jpg
Filesize=333KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170729_0415.jpg](albums/Pilbara/07-2017/thumb_170729_0415.jpg)
170729 041596 viewsSeven Mile yard, a loaded train departs the yard for Parker Point dumpers behind General Electric built Dash 9-44CW unit 7044 serial 57095 in Pilbara Iron livery with HI reporting marks, ES44DCi unit 8134 in Rio Tinto stripes and another Dash 9-44CW unit 9407 in Pilbara Rail livery with Robe reporting marks. 29th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170729_0322.jpg
Filesize=618KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170729_0322.jpg](albums/Pilbara/07-2017/thumb_170729_0322.jpg)
170729 032288 viewsParker Point, an empty train is worked back towards Seven Mile yard along the Empty Car Line behind General Electric built Dash 9-44CW unit 7069 serial 47748 in the original Hamersley Iron livery from 1994 and ES44DCi unit 8195. 29th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170729_0303.jpg
Filesize=563KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170729_0303.jpg](albums/Pilbara/07-2017/thumb_170729_0303.jpg)
170729 030396 viewsMaitland Siding on the former Robe River line an empty Mesa A bound train behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9117 serial 63830 and sister unit 9115 pull out of the passing siding and onto the mainline. 29th July 2017. GeoData.Oct 16, 2017
|
|
![Filename=170729_0289.jpg
Filesize=430KiB
Dimensions=1280x853
Date added=Oct 16, 2017 170729_0289.jpg](albums/Pilbara/07-2017/thumb_170729_0289.jpg)
170729 028986 viewsMaitland Siding on the former Robe River line a loaded Deepdale train heading for Cape Lambert behind the standard Rio Tinto motive power for this line, double General Electric built ES44ACi units, 9114 serial 62545 and sister unit 9101 serial 61939 will stay on the main as an empty train waits on the passing siding. 29th July 2017. GeoData.Oct 16, 2017
|
|
16487 files on 825 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
191 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|