Last additions |

256-15203 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.Nov 20, 2021
|
|

256-14201 views89.6 km, Toyota Landcruiser HJ75, waiting for a train. May 2002.Nov 20, 2021
|
|

256-13207 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|

256-12227 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|

256-11216 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|

256-10220 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|

256-09210 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|

256-08221 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|

256-07209 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
|
|

256-06222 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
|
|

256-05201 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
|
|

256-04217 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|

256-03220 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|

256-02195 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|

256-01212 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
|
|

WTT Combined Regions General-Instructions 1986-11-11 315 viewsGeneral Instructions for the Combined Regions working timetable 11th November 1986.
Complete 154 pages, 15.5 MB download.Sep 25, 2021
|
|

WTT Combined Regions 1987-10-11 288 viewsCombined Regions working timetable 11th October 1987.
Complete 123 pages, 13 MB download.Sep 24, 2021
|
|

WTT Addenda MET-Trains 1997-02-17291 viewsMET Trains Working Timetable Addenda 17th February 1997.
Complete 96 pages, 13.1 MB download.Sep 24, 2021
|
|

WTT Mildura Diesel 1953 16-53272 viewsInauguration of Diesel-Electric Operation of Melbourne - Mildura
Monday 16th March 1953.
18 pages PDF download 9.7 MB.Sep 19, 2021
|
|

255-37213 viewsEmu Siding on the Hamersley Iron Dampier to Tom Price line with the Western Creek Robe River interconnecting line joining the East Mainline, the mileage is 76.3 km on the Robe and 78.4 on the HI. The interconnecting line branches off the Robe River Cape Lambert to Deepdale line at the 71.1 km. Geodata location here. May 2002.Sep 12, 2021
|
|
18442 files on 923 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
194 |  |
 |
 |
 |
 |
 |
 |
|