Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
249-17.jpg
249-171 viewsTable Hill on the Robe River railway line, looking in a northerly direction as the railway line snakes north and heads through Lockyer Gap towards Cape Lambert. Following a very wet 1999 cyclone season Lake Poongkaliyarra is very full. Approximate location.Nov 12, 2020
249-16.jpg
249-160 viewsTable Hill on the Robe River railway line, looking in a southerly direction as the railway line snakes south towards the Chichester's. Approximate location.Nov 12, 2020
249-15.jpg
249-150 viewsTable Hill on the Robe River railway line, a microwave radio communications site powered by solar panels. Approximate location.Nov 12, 2020
249-14.jpg
249-140 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-13.jpg
249-130 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-12.jpg
249-120 viewsYule River bridge looking north from the bridge deck on the BHP mainline of the sunk track section. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-11.jpg
249-110 viewsYule River bridge looking north west downstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-10.jpg
249-100 viewsYule River bridge south abutment showing the chainage of the railway line. Approximate location.Nov 12, 2020
249-09.jpg
249-090 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-08.jpg
249-080 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-07.jpg
249-070 viewsYule River bridge looking north east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-06.jpg
249-060 viewsYule River bridge looking east upstream the third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-05.jpg
249-050 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-04.jpg
249-040 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-03.jpg
249-030 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-02.jpg
249-020 viewsYule River bridge looking north from the 160 km on the BHP mainline. The third pier from the southern end was undermined by flood waters from Tropical Cyclone John in December 1999. The rail line was closed for two weeks while repairs were effected. Approximate location.Nov 12, 2020
249-01.jpg
249-010 viewsYule River road crossing on the former Hedland - Wittenoom Road in flood after Tropical Cyclone John in December 1999. Approximate location.Nov 12, 2020
248-25.jpg
248-253 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9426 a Comeng WA CE636R rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania Railroad as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into CE636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Behind it is sister unit 9427 and ALCo M636 9412. Approximate location. 24th April 2004.Nov 03, 2020
248-24.jpg
248-243 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9426 a Comeng WA CE636R rebuild from ALCo Schenectady NY model C636 serial 3499-3 originally built in January 1968 for Pennsylvania Railroad as #6332, Penn Central 6332 and finally Conrail 6782. Purchased in 1986 and rebuilt by Comeng WA into CE636R before delivery to Robe in November 1986. This loco also went on to become DR 8401 for construction of FMG's railway in 2007-08. Behind it is sister unit 9427 and ALCo M636 9412. Approximate location. 24th April 2004.Nov 03, 2020
248-23.jpg
248-232 viewsSeven Mile yard, stored Robe River ALCo locomotives at the south end of the Hamersley Iron Seven Mile yard on roads N2 and N3. On road N2 is 9427 a Comeng WA CE636R rebuild from ALCo Schenectady NY model C636 serial 3499-2 originally built in January 1968 for Pennsylvania Railroad as #6331, Penn Central 6331 and finally Conrail 6781. Purchased in 1986 and rebuilt by Comeng WA into CE636R before delivery to Robe in January 1987. This loco also went on to become DR 8403 for construction of FMG's railway in 2007-08. Approximate location. 24th April 2004.Nov 03, 2020
14130 files on 707 page(s) 2

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Website and all images are © 1997-2021 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional