255-20.jpg
255-20248 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.Sep 12, 2021
255-19.jpg
255-19239 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.Sep 12, 2021
255-18.jpg
255-18208 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.Sep 12, 2021
255-17.jpg
255-17212 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.Sep 12, 2021
255-16.jpg
255-16219 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.Sep 12, 2021
255-15.jpg
255-15207 viewsAt the 162.2 km looking north are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale lone is on the left while the spur runs behind the photographer and curves away from the Deepdale line. Geodata location here. May 2002.Sep 12, 2021
255-14.jpg
255-14217 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left while the Deepdale line is on the right. Geodata location here. May 2002.Sep 12, 2021
255-13.jpg
255-13223 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale line is on the right. Geodata location here. May 2002.Sep 12, 2021
255-12.jpg
255-12198 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.Sep 12, 2021
255-11.jpg
255-11214 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.Sep 12, 2021
255-10.jpg
255-10212 viewsSiding Three looking south at the south end signal for loaded trains or up movements. Various cabinets and DD or dragging equipment detector bars. May 2002.Sep 12, 2021
255-09.jpg
255-09227 viewsSiding Three looking south at the south end points, switch machine and various cabinets and solar panels and DD or dragging equipment detector bars. May 2002.Sep 12, 2021
255-08.jpg
255-08249 viewsSiding Three, swing nose point machine on the south end points riding on concrete sleepers at the 134.7 km. May 2002.Sep 12, 2021
255-07.jpg
255-07260 viewsSiding Three looking south along the Cape Lambert to Deepdale mainline at the south end signal for the mainline, passing track is on the right with points in the distance. May 2002.Sep 12, 2021
255-06.jpg
255-06976 viewsSiding Three looking south along the Cape Lambert to Deepdale mainline at the south end signals. Passing track is on the right. May 2002.Sep 12, 2021
255-05.jpg
255-05279 viewsSiding Three looking south across the 133.3 km grade crossing with Tamper 1 and a sleeper inserter machine stabled in the back track. Both machines are Fairmont Tamper units. Geodata location here. May 2002.Sep 12, 2021
255-04.jpg
255-04231 viewsSiding Three back track, Robe 9456 Tamper 1, a Fairmont Tamper Mk VI switch tamper machine. May 2002.Sep 12, 2021
255-03.jpg
255-03235 viewsSiding Three back track, Fairmont Tamper sleeper inserter machine. May 2002.Sep 12, 2021
255-02.jpg
255-02229 viewsFortescue River bridge on the Robe River Cape Lambert to Deepdale line at the 115.8 km looking south. Geodata location here. May 2002.Sep 12, 2021
255-01.jpg
255-01233 viewsFortescue River bridge on the Robe River Cape Lambert to Deepdale line at the 115.8 km looking south. Geodata location here. May 2002.Sep 12, 2021
18961 files on 949 page(s) 217

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional