Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
256-26.jpg
256-26346 viewsMaitland Siding, Robe River CM40-8M unit 9418 on an empty train. 9418 was built by ALCo Schenectady NY USA as an ALCo C630 model in October 1967 with serial number 3486-02 for the Chesapeake and Ohio Railroad Company (USA) with road number 2101. It was purchased by Morrison Knudsen for Robe River (along with three sister units) and delivered in January 1975 and repainted and renumbered as 9418 on arrival. 9418 was rebuilt by Goninan WA in December 1990 to become an CM40-8M model with serial number 8109-12 / 90-118. May 2002.Nov 20, 2021
256-25.jpg
256-25345 viewsMaitland Siding, Robe River CM40-8M unit 9422 on an empty train. 9422 was built by Comeng NSW as an ALCo M636 model in August 1977 with serial C6103-2 and delivered to Robe River in November 1977. 22nd February 1979 9422 was lead unit on empty train involved in head on collision at Siding One, it was repaired at Cape Lambert and returned to service. It was eventually rebuilt by Goninan in March 1993 to become an CM40-8M with serial number 8297-03 / 93-138. May 2002.Nov 20, 2021
256-24.jpg
256-24315 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train passes sister units 9420 and 9410 on a loaded train. May 2002.Nov 20, 2021
256-23.jpg
256-23304 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train passes sister unit 9414 heading up a loaded train. May 2002.Nov 20, 2021
256-22.jpg
256-22315 viewsMaitland Siding, Robe River CM40-8M unit 9417 (2nd) leading an empty train into the passing track. 9417 was the first CM40-8M rebuild carried out by Goninan in 1989, it was originally an ALCo built C636 unit for Spokane Portland & Seattle numbered 340 with serial number 6010-1, it went onto to be Burlington Northern 4366 and then purchased for Robe River in late 1980 as a parts source. When finally rebuilt by Goninan in June 1989 it had new serial number of 6266-5 / 89-83 and replaced the original 9417 which was scrapped in 1979. May 2002.Nov 20, 2021
256-21.jpg
256-21350 viewsMaitland Siding, morning empty train arriving into the passing track behind quad CM40-8M working of 9417, 9433, 9418 and 9419. May 2002.Nov 20, 2021
256-20.jpg
256-20342 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.Nov 20, 2021
256-19.jpg
256-19323 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.Nov 20, 2021
256-18.jpg
256-18311 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.Nov 20, 2021
256-17.jpg
256-17351 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.Nov 20, 2021
256-16.jpg
256-16367 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.Nov 20, 2021
256-15.jpg
256-15295 viewsMaitland Siding, early morning loaded train waiting for a meet with an empty behind the quad CM40-8M working of 9414, 9420, 9410 and 9425. May 2002.Nov 20, 2021
256-14.jpg
256-14285 views89.6 km, Toyota Landcruiser HJ75, waiting for a train. May 2002.Nov 20, 2021
256-13.jpg
256-13316 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-12.jpg
256-12338 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-11.jpg
256-11331 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-10.jpg
256-10345 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-09.jpg
256-09324 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-08.jpg
256-08319 viewsMaitland Siding on the Cape Lambert to Deepdale railway has a late afternoon empty train with the quad CM40-8M working of 9425, 9410, 9420 and 9414 in the siding waiting for a cross with an opposing loaded train. At the time of this image Siding 3 or Murray Camp was unable to cross ore trains so Siding One - Harding or Siding Two - Maitland were used. May 2002.Nov 20, 2021
256-07.jpg
256-07326 viewsMaitland Siding located between the 92.8 and 95.1 km on the Cape Lambert line, view of the south end points and swing nose frog with dragging detector bars, solar panel and cabinets for signal and point control with an empty train sitting in the passing track awaiting a meet. May 2002.Nov 20, 2021
19088 files on 955 page(s) 221

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional