Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
050412_0750.jpg
050412 0750216 viewsQuarry 8, Shaw Siding area. Side view of 1963 built Magor USA waggon 527, originally in ore service before conversion to a ballast waggon.Jan 18, 2017
050412_0737.jpg
050412 0737222 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive 5665 on the point of an empty ballast waggon rake awaiting loading, waggon 504 is a modified Magor USA built ore waggon from 1963 and from the Oroville Dam construction.Jan 18, 2017
050412_0735.jpg
050412 0735219 viewsQuarry 8, Shaw Siding area. A dash 8 locomotive on the point of an empty ballast waggon rake awaiting loading, waggons are modified Magor USA built ore waggons from the Oroville Dam construction.Jan 18, 2017
050410_0545.jpg
050410 0545201 viewsNelson Point, tanker filling area, fuel tank waggons 0018 a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 and 0015 a Comeng NSW built 112 kilolitre tank waggon, one of a batch of four built in 1972 and both wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.Jan 18, 2017
050410_0542.jpg
050410 0542192 viewsNelson Point, tanker filling area, fuel tank waggon 0015, a Comeng NSW built 112 kilolitre tank waggon, one of a batch of four built in 1972 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.Jan 18, 2017
050410_0540.jpg
050410 0540207 viewsNelson Point, tanker filling area, fuel tank waggon 0015, a Comeng NSW built 112 kilolitre tank waggon, one of a batch of four built in 1972 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.Jan 18, 2017
050410_0537.jpg
050410 0537215 viewsNelson Point, tanker filling area, fuel tank waggon 0018, a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.Jan 18, 2017
050410_0536.jpg
050410 0536204 viewsNelson Point, tanker filling area, fuel tank waggon 0018, a Comeng WA built 114 kilolitre tank waggon, one of a batch of three built in 1974-75 wearing the newer corporate 'Earth' livery of BHP Billiton Iron Ore.Jan 18, 2017
050319_0149.jpg
050319 0149202 viewsNelson Point, dumper pilot SD40 3080 with compressor waggon set #1, made up of spacer/ballast waggon 681 and compressor waggon 671, both converted from original Magor built 91 ton ore waggons, painted white.Jan 18, 2017
050319_0144.jpg
050319 0144216 viewsNelson Point, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.Jan 18, 2017
050319_0143.jpg
050319 0143193 viewsNelson Point, rail recovery and transport train, 2nd lead off waggon 6201, built by Comeng WA, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.Jan 18, 2017
050319_0142.jpg
050319 0142197 viewsNelson Point, rail recovery and transport train, 1st lead off waggon 6011, built by Scotts of Ipswich 04-09-1970, the mesh guarding is for the winch cable. The chute arrangement for the discharging and recovery of rail is visible.Jan 18, 2017
050319_0141.jpg
050319 0141204 viewsNelson Point, cut down Magor USA built former Oroville Dam 91 ton ore waggon 665, now used as the crib waggon on the steel train, side view.Jan 18, 2017
050319_0140.jpg
050319 0140197 viewsNelson Point, cut down Magor USA built former Oroville Dam 91 ton ore waggon 665, now used as the crib waggon on the steel train, 3/4 view.Jan 18, 2017
050319_0139.jpg
050319 0139269 viewsNelson Point, a heavily cut down and modified Magor USA ore waggon, converted to a 50 tonne waggon and designated the winch waggon with generator set to power the winch and the crib car.Jan 18, 2017
050319_0138.jpg
050319 0138217 viewsNelson Point, cut down Magor USA built former Oroville Dam 91 ton ore waggon 665, seen here being used as the crib waggon on the steel train.Jan 18, 2017
050319_0137.jpg
050319 0137292 viewsNelson Point, view of the Steel Train set sitting out in the South Yard, cut down Magor USA built former Oroville Dam 91 ton ore waggon, now used as the crib waggon on the rear of the Steel Train.Jan 18, 2017
041225_070554.jpg
041225 070554216 viewsNelson Point, Ore Car Repair Shop roads, flat waggon no. 5, later renumbered 6705. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.Jan 18, 2017
041225_070523.jpg
041225 070523247 viewsNelson Point, Ore Car Repair Shop roads, flat waggon no. 5, later renumbered 6705. Originally in service with Goldsworthy Mining as a BC or BCV box van, built by Comeng WA in 1966.Jan 18, 2017
041225_064817.jpg
041225 064817257 viewsNelson Point, CFCLA ballast waggon CHRY type CHRY 746, side view from the ore car repair shop roads.Jan 18, 2017
16913 files on 846 page(s) 271

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional