Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
070414_8758.jpg
070414 87581171 viewsNelson Point Locomotive Overhaul Workshop, brand new line up of BHP Billiton Electro-Motive built SD70ACe/LC units during fitting out by EDI with 4314 serial 20058712-001. Note the bolt on lashing points for shipping, 14th April 2007.Mar 20, 2018
090114_0879.jpg
090114 08791113 viewsPort Hedland, Electro-Motive built SD70ACe/LC loco 4342 serial 20078915-009 turns off Gilbert Street and into Nelson Point via Gate 9 14th January 2009.Mar 19, 2018
090113_0796.jpg
090113 07961034 viewsPort Hedland, brand new Electro-Motive built SD70ACe/LC unit 4339 serial 20078915-006 waits to enter Nelson Point at Gate 9 on the 13th January 2009.Mar 19, 2018
090113_0757.jpg
090113 0757980 viewsPort Hedland, brand new Electro-Motive built SD70ACe/LC unit 4345 serial 20078915-012 leaves the port of Port Hedland and heads for Nelson Point to put placed on rails. Kingston Transport provide the 128 wheel floats and prime movers. 13th January 2009.Mar 19, 2018
090121_0936.jpg
090121 09361052 viewsNelson Point, comparison view of the radiator sections between Electro-Motive built SD70ACe/LC (low clearance) unit 4309 'Gidgi' serial 20038540-010 on the left and standard Electro-Motive built SD70ACe (ex-BNSF) unit 4333 serial 20066862-062 on the right. 21st January 2009.Mar 19, 2018
090114_0904.jpg
090114 0904986 viewsPort Hedland, the last of the current order at the time and last off the ship, Electro-Motive built SD70ACe/LC loco 4346 serial 20078915-013 swings off Gilbert Street and into Nelson Point via Gate 9 on the 14th January 2009.Mar 19, 2018
060417_3540.jpg
060417 35401002 viewsNelson Point Yard, still relatively new Electro-Motive built SD70ACe/LC unit 4305 serial 20038540-006 'Coonarie' under lights awaits it next job on the evening 17th April 2006.Mar 19, 2018
060417_3531.jpg
060417 3531943 viewsNelson Point Yard, still relatively new Electro-Motive built SD70ACe/LC unit 4305 serial 20038540-006 'Coonarie' under lights awaits it next job on the evening 17th April 2006.Mar 19, 2018
060417_3528.jpg
060417 35281019 viewsNelson Point Yard, still relatively new Electro-Motive built SD70ACe/LC unit 4305 serial 20038540-006 'Coonarie' under lights awaits it next job on the evening 17th April 2006.Mar 19, 2018
241-37.jpg
241-37373 viewsNelson Point, Car Dumper 2 holding roads, two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.Feb 19, 2018
241-36.jpg
241-36387 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.Feb 19, 2018
241-35.jpg
241-35366 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as two loaded ore rakes behind pairs of CM40-8M units on each wait their turn through the dumper to discharge as 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge . June 2002.Feb 19, 2018
241-34.jpg
241-34374 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist. June 2002.Feb 19, 2018
241-33.jpg
241-33377 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5660 'Kure' serial 8412-05 / 94-151 and 5657 'Fukuyama' drag their loaded train towards the dumper to discharge passing a similar consist with the Ore Car Repair Shop in the background. June 2002.Feb 19, 2018
241-31.jpg
241-31389 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5649 'Pohang' and 5640 'Ethel Creek' wait their turn through the dumper to discharge. June 2002.Feb 19, 2018
241-32.jpg
241-32355 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.Feb 19, 2018
241-30.jpg
241-30361 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.Feb 19, 2018
241-29.jpg
241-29350 viewsNelson Point, Car Dumper 2 holding roads, a pair of CM40-8M units 5649 'Pohang' and 5640 'Ethel Creek' wait their turn through the dumper to discharge. June 2002.Feb 19, 2018
241-27.jpg
241-27346 viewsNelson Point, Mt Newman Mining's last in-service ALCo M636 unit 5499 serial C6096--4 built by Comeng NSW sits awaiting partial dismantling before being sent by road to Rail Heritage WA's museum at Bassendean, Perth for preservation. Drivers side front view of the cab with pilot missing. June 2002.Feb 19, 2018
241-28.jpg
241-28357 viewsNelson Point, Car Dumper 2 holding roads with Yard Control tower and Ore Car Repair Shop in the background as three loaded ore rakes behind a pair of CM40-8M units on each wait their turn through the dumper to discharge. June 2002.Feb 19, 2018
19088 files on 955 page(s) 291

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional