Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
232-22.jpg
232-2279 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.Mar 21, 2016
232-23.jpg
232-2369 viewsYandi One balloon loop, as a train is being loaded the mid-train remotes approach, waggons are standard Comeng WA builds. 18th of February 1997. GeoData.Mar 21, 2016
232-21.jpg
232-2175 viewsYandi One loadout portal as a train is being loaded. Waggons are from left, a 3CR12 re-sheeted Comeng, an Oroville built by Magor USA and a standard Comeng WA build. 18th of February 1997. GeoData.Mar 21, 2016
232-20.jpg
232-2066 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore loaded Comeng WA built ore waggon 2871 has been re-sheeted with 3CR12 stainless steel side walls, view of broken coupler. February 1997. GeoData.Mar 21, 2016
232-19.jpg
232-1980 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore loaded Comeng WA built ore waggon 2871 has been re-sheeted with 3CR12 stainless steel side walls. February 1997. GeoData.Mar 21, 2016
232-18.jpg
232-1884 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.Mar 21, 2016
232-17.jpg
232-1784 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.Mar 21, 2016
232-16.jpg
232-1693 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.Mar 21, 2016
232-14.jpg
232-1489 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.Mar 21, 2016
232-15.jpg
232-1586 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore empty 82 kL Comeng NSW built tank waggon 0004 one of six such tank waggons built in 1970-71. February 1997. GeoData.Mar 21, 2016
232-12.jpg
232-1297 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.Mar 21, 2016
232-13.jpg
232-13173 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore 50 ton waggon 6703, one of three 'special' waggons converted from Magor USA built ore waggons by the Mt Newman Workshops. February 1997. GeoData.Mar 21, 2016
232-11.jpg
232-1181 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.Mar 21, 2016
232-10.jpg
232-10103 viewsYandi One backtrack, following a cyclone shutdown of the mainline and severe flooding around Yandi a 'mixed' freight train was operated to Yandi to deliver food, mail and diesel fuel to the mine and camp. Here BHP Iron Ore CM40-8M unit 5639 'Corunna Downs' serial 8281-03 / 92-128 idles away in the backtrack awaiting its path back to Port Hedland with flat waggon 6703, four fuel tank waggons and a broken ore waggon. February 1997. GeoData.Mar 21, 2016
232-08.jpg
232-08143 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cab-less unit 5665, both are Goninan rebuild CM40-8M GE units, 59 is still in the teal and marigold logo livery. 3rd of February 1997. GeoData.Mar 21, 2016
232-09.jpg
232-093689 viewsYandi One balloon loop, BHP Iron Ore waggon 2343 built by Comeng WA as one of the second batch of one hundred and eighty three waggons built between 1969 and 1970. The white body panel signifies the rotary coupler end. February 1997. GeoData.Mar 21, 2016
232-07.jpg
232-07309 viewsYandi One balloon loop cabless BHP Iron Ore Goninan rebuild CM40-8ML (L for LocoTrol) GE unit 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid-train remote power of train no. 1718 which is partway through loading on the afternoon of 3rd of February 1997. GeoData.Mar 21, 2016
232-06.jpg
232-06121 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cabless unit 5665, both are Goninan rebuild CM40-8M GE units, 59 is still in the teal and marigold logo livery. 3rd of February 1997. GeoData.Mar 21, 2016
232-04.jpg
232-0484 viewsYandi Two, view west from near the 311.6 km grade crossing, train can be seen loading on the right. February 1997. GeoData.Mar 21, 2016
232-05.jpg
232-05122 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cab-less unit 5665 'Rotterdam' serial 8412-10 / 94-156, both are Goninan rebuild CM40-8M GE units with 65 having an L on its' designation as cabless with LocoTrol. 3rd February 1997. GeoData.Mar 21, 2016
16487 files on 825 page(s) 408

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional