Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
232-03.jpg
232-0379 viewsYandi Two, view to the stockpile looking west from near the 311.6 km grade crossing. A train can be seen loading on the right. February 1997. GeoData.Mar 21, 2016
232-02.jpg
232-0283 viewsYandi Two entry portal for the loadout tunnel entry sign. February 1997. GeoData.Mar 21, 2016
232-01.jpg
232-0188 viewsYandi Two entry portal for the loadout tunnel with dust extraction pipes. February 1997. GeoData.Mar 21, 2016
232-00.jpg
232-00118 viewsYandi Two crushing and screening plant, built and operated by Henry Walker for BHP Iron Ore, overview from the radial stacker feed conveyor. From the left is the primary crusher, the dual secondary crushers can be made out behind the tertiary crushers in the middle and the screenhouse is the large building tot he right, the conveyor leading to the right is CV210. February 1997. GeoData.Mar 21, 2016
231-36.jpg
231-3668 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-37.jpg
231-3776 viewsYandi Two balloon loop, BHP Iron Ore 5638 'Mallina' serial 8281-02 / 92-127 a Goninan WA rebuild CM40-8M GE unit is the lead remote mid-train unit as it loads a train at 1.2 km/h with second unit 5656, not the difference in the fuel tanks, 38 is rebuilt from an AE Goodwin NSW built C636 ALCo while 56 is rebuilt from a Comeng NSW built M636 ALCo. GeoData.Mar 21, 2016
231-35.jpg
231-3570 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-34.jpg
231-3461 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-33.jpg
231-3370 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-32.jpg
231-3270 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as it runs across the crossing. GeoData.Mar 21, 2016
231-31.jpg
231-3169 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-30.jpg
231-3062 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-29.jpg
231-2962 viewsYandi Two balloon loop, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5652 on the left is the lead, while 5650 on the right is second unit. GeoData.Mar 21, 2016
231-28.jpg
231-2866 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h, note the missing logo from the hood and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.Mar 21, 2016
231-27.jpg
231-2765 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-26.jpg
231-2660 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-25.jpg
231-2565 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650 as the outgoing crew arrive to change out. GeoData.Mar 21, 2016
231-24.jpg
231-2463 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650 as the outgoing crew arrive to change out. GeoData.Mar 21, 2016
231-22.jpg
231-2267 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h, note the silver logo on the rear and the missing logo from the hood, the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.Mar 21, 2016
231-23.jpg
231-2369 viewsYandi Two balloon loop, BHP Iron Ore 5650 'Yawata' serial 8412-09 / 93-141 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as second unit, note the logos are the original teal and marigold and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.Mar 21, 2016
16487 files on 825 page(s) 409

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional