Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
232-07.jpg
232-07554 viewsYandi One balloon loop cabless BHP Iron Ore Goninan rebuild CM40-8ML (L for LocoTrol) GE unit 5665 'Rotterdam' serial 8412-10 / 94-156 in the mid-train remote power of train no. 1718 which is partway through loading on the afternoon of 3rd of February 1997. GeoData.Mar 21, 2016
232-06.jpg
232-06272 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cabless unit 5665, both are Goninan rebuild CM40-8M GE units, 59 is still in the teal and marigold logo livery. 3rd of February 1997. GeoData.Mar 21, 2016
232-04.jpg
232-04219 viewsYandi Two, view west from near the 311.6 km grade crossing, train can be seen loading on the right. February 1997. GeoData.Mar 21, 2016
232-05.jpg
232-05271 viewsYandi One balloon loop, mid-train remote units of train no. 1718 which is partway through loading, BHP Iron Ore unit 5659 'Kobe' serial 8412-04 / 94-150 leads cab-less unit 5665 'Rotterdam' serial 8412-10 / 94-156, both are Goninan rebuild CM40-8M GE units with 65 having an L on its' designation as cabless with LocoTrol. 3rd February 1997. GeoData.Mar 21, 2016
232-03.jpg
232-03203 viewsYandi Two, view to the stockpile looking west from near the 311.6 km grade crossing. A train can be seen loading on the right. February 1997. GeoData.Mar 21, 2016
232-02.jpg
232-02220 viewsYandi Two entry portal for the loadout tunnel entry sign. February 1997. GeoData.Mar 21, 2016
232-01.jpg
232-01226 viewsYandi Two entry portal for the loadout tunnel with dust extraction pipes. February 1997. GeoData.Mar 21, 2016
232-00.jpg
232-00215 viewsYandi Two crushing and screening plant, built and operated by Henry Walker for BHP Iron Ore, overview from the radial stacker feed conveyor. From the left is the primary crusher, the dual secondary crushers can be made out behind the tertiary crushers in the middle and the screenhouse is the large building tot he right, the conveyor leading to the right is CV210. February 1997. GeoData.Mar 21, 2016
231-36.jpg
231-36205 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-37.jpg
231-37216 viewsYandi Two balloon loop, BHP Iron Ore 5638 'Mallina' serial 8281-02 / 92-127 a Goninan WA rebuild CM40-8M GE unit is the lead remote mid-train unit as it loads a train at 1.2 km/h with second unit 5656, not the difference in the fuel tanks, 38 is rebuilt from an AE Goodwin NSW built C636 ALCo while 56 is rebuilt from a Comeng NSW built M636 ALCo. GeoData.Mar 21, 2016
231-35.jpg
231-35186 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-34.jpg
231-34184 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-33.jpg
231-33202 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-32.jpg
231-32190 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h as it runs across the crossing. GeoData.Mar 21, 2016
231-31.jpg
231-31187 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-30.jpg
231-30188 viewsYandi Two balloon loop 316.2 km grade crossing, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-29.jpg
231-29187 viewsYandi Two balloon loop, view of the connections between the two remote power units on an empty train, Goninan rebuild CM40-8M GE unit 5652 on the left is the lead, while 5650 on the right is second unit. GeoData.Mar 21, 2016
231-28.jpg
231-28192 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h, note the missing logo from the hood and the round style fuel tanks tells us this units was rebuilt from an AE Goodwin built M636 ALCo. GeoData.Mar 21, 2016
231-27.jpg
231-27189 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
231-26.jpg
231-26192 viewsYandi Two balloon loop, BHP Iron Ore 5652 'Villanueva' serial 8412-09 / 93-143 an Goninan WA rebuild CM40-8M GE unit loads a train at 1.2 km/h with second unit 5650. GeoData.Mar 21, 2016
16911 files on 846 page(s) 430

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional