Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
191-08.jpg
191-08120 viewsSeymour, looking south at the northern most Goulburn River bridge, end of Gordon Crescent, Seymour, quarry to the left. V/Line G class on down Sydney Express on the standard gauge, broad gauge lines on the right, Seymour behind photographer.Oct 03, 2015
191-07.jpg
191-07131 viewsSeymour station yard south end, Australian National 52 tonne capacity open waggon ROOX type ROOX 3007, recoded from AOOX, one of two hundred GOX type open waggons built by Transfield WA in between 1974 and 1976.Oct 03, 2015
191-06.jpg
191-06134 viewsSeymour station, rationalised yard, V/Line T class unit T 410 Clyde Engineering EMD model G8B serial 68-626 coupled behind A class A 66 with a stabled down Wodonga goods train, Sunday.Oct 03, 2015
191-05.jpg
191-05129 viewsSeymour station, rationalised yard, V/Line A class unit A 66 Clyde Engineering EMD rebuild model AAT22C-2R serial 84-1186 coupled to stablemate model G8B T class T 410 serial 68-626 with a stabled down Wodonga goods train, Sunday.Oct 03, 2015
191-04.jpg
191-04149 viewsSeymour station, rationalised yard, V/Line A class unit A 66 Clyde Engineering EMD rebuild model AAT22C-2R serial 84-1186 leads T class T 410 with a stabled down Wodonga goods train.Oct 03, 2015
191-03.jpg
191-03170 viewsSeymour station, rationalised yard, V/Line A class A 70 Clyde Engineering EMD rebuild model AAT22C-2R serial 84-1187, ex ML2 unit B 70 ML2-11 awaits the evening Cobram down pass.Oct 03, 2015
191-01.jpg
191-01122 viewsWandong, O'Gradys Road grade crossing, near former Mathiesons Siding, UP Melbourne Express hauled by V/Line G class.Oct 03, 2015
191-02.jpg
191-02139 viewsWandong, Road grade crossing, near former Mathiesons Siding, UP Melbourne Express behind standard early 1990s V/Line G class power of Clyde Engineering built EMD model JT26C-2SS, G 521 serial 85-1234.Oct 03, 2015
221-37.jpg
221-37106 viewsYandi One mine loadout balloon loop, front on view of near new General Electric AC6000 unit 6074 serial 51066 as it loads a train.Sep 19, 2015
221-36.jpg
221-3679 viewsYandi One mine loadout balloon loop, front on view of near new General Electric AC6000 unit 6074 serial 51066 as it loads a train.Sep 19, 2015
221-35.jpg
221-35100 viewsYandi One mine loadout balloon loop, view out the cab window from near new General Electric AC6000 unit 6074 serial 51066.Sep 19, 2015
221-34.jpg
221-3495 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
221-33.jpg
221-3388 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
221-32.jpg
221-3292 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
221-31.jpg
221-3184 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
221-30.jpg
221-3091 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
221-29.jpg
221-2993 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.Sep 19, 2015
221-28.jpg
221-2879 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.Sep 19, 2015
221-27.jpg
221-2787 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.Sep 19, 2015
221-26.jpg
221-2686 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
16487 files on 825 page(s) 445

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional