Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
224-15.jpg
224-15227 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, radiator, steerable bogie and taper in cab side. GeoData.Oct 27, 2015
224-14.jpg
224-14246 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, radiator, steerable bogie and taper in cab side. GeoData.Oct 27, 2015
224-13.jpg
224-13216 viewsBing siding, the extent of the General Electric AC6000 radiators is evident in this back to back image of a pair of units.Oct 27, 2015
224-12.jpg
224-12241 viewsBing siding, the extent of the General Electric AC6000 radiators is evident in this back to back image of a pair of units.Oct 27, 2015
224-11.jpg
224-11227 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, shows new nameplate, steerable bogie and taper in cab side, second unit behind sister loco 6076. GeoData.Oct 27, 2015
224-10.jpg
224-10227 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.Oct 27, 2015
224-09.jpg
224-09219 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.Oct 27, 2015
224-08.jpg
224-08222 viewsBing siding, 6073 'Fortescue' serial 51065 a General Electric AC6000 built by GE at Erie awaits the road to depart south, cab side shows new nameplate, steerable bogie and taper in cab side. GeoData.Oct 27, 2015
224-07.jpg
224-07241 viewsBing siding, 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south. GeoData.Oct 27, 2015
224-06.jpg
224-06234 viewsBing siding, 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south. GeoData.Oct 27, 2015
224-05.jpg
224-05260 viewsBing siding, the extent of the General Electric AC6000 radiators is evident in this back to back image of a pair of units.Oct 27, 2015
224-03.jpg
224-03248 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south. GeoData.Oct 27, 2015
224-04.jpg
224-04254 viewsBing siding, the extent of the General Electric AC6000 radiators is evident in this back to back image of a pair of units.Oct 27, 2015
224-02.jpg
224-02240 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073. GeoData.Oct 27, 2015
224-01.jpg
224-01258 viewsBing siding, the afternoon empty to Yandi was a staple of the AC6000 units when delivered, operating the train as a pair, 112 waggons, AC6000 and 112 waggons. 6076 'Mt Goldsworthy' serial 51068 a General Electric AC6000 built by GE at Erie awaits the road to depart south with sister unit 6073. GeoData.Oct 27, 2015
222-37.jpg
222-37218 viewsLoaded Hamersley Iron Comeng NSW built ore waggon 562, one of a batch of 150 built in 1968.Oct 26, 2015
222-36.jpg
222-36185 viewsSomewhere on the original single line section between Gull and Rosella a pair of Hamersley Iron General Electric Dash 9-44CW's built by GE at Erie power a loaded train towards Dampier from the passing track back onto the mainline following a crew change.Oct 26, 2015
222-35.jpg
222-35200 viewsSomewhere on the original single line section between Gull and Rosella a pair of Hamersley Iron General Electric Dash 9-44CW's built by GE at Erie power a loaded train towards Dampier from the passing track back onto the mainline following a crew change.Oct 26, 2015
222-34.jpg
222-34179 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train away from the passing track back onto the mainline following a crew change with second unit 7066 serial 47745.Oct 26, 2015
222-33.jpg
222-33190 viewsSomewhere on the original single line section between Gull and Rosella Hamersley Iron 7071 serial 47750 a General Electric Dash 9-44CW built by GE at Erie brings a loaded train away from the passing track back onto the mainline following a crew change with second unit 7066.Oct 26, 2015
16911 files on 846 page(s) 461

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional