Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
130705_0619.jpg
130705 061952 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
130705_0618.jpg
130705 061858 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
130705_0617.jpg
130705 061759 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
130705_0616.jpg
130705 061660 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
130705_0615.jpg
130705 061560 viewsLock, with loading finished, 1203 leads 846, 859 and the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
130705_0614.jpg
130705 061460 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
130705_0613.jpg
130705 061358 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
130705_0612.jpg
130705 061256 viewsLock, with loading finished, 1203 leads the final portion along goods siding #1 as it prepares to shunt back onto the loaded portion on the mainline for departure to Port Lincoln.Jan 27, 2015
130705_0611.jpg
130705 061155 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0609.jpg
130705 060952 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0610.jpg
130705 061059 viewsLock, up end looking down through Lock, Ascom silo block #5 on the left, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0608.jpg
130705 060855 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0607.jpg
130705 060759 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0605.jpg
130705 060558 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0606.jpg
130705 060662 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0603.jpg
130705 060359 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left is the concrete toilet block, Ascom silo complex (Block 5), the train is loading on the grain loop, loaded rake on the mainline, horizontal bunker (Block 4) and the crew barracks. 5th July 2013.Jan 27, 2015
130705_0604.jpg
130705 060462 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0601.jpg
130705 060165 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0602.jpg
130705 060251 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0600.jpg
130705 060052 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
16487 files on 825 page(s) 507

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional