Last additions |

130705 0520123 viewsLock, former Australian National narrow gauge 830 class locomotive 846, an AE Goodwin built ALCo DL531 model with serial 84715 built new for the SAR in 1963 and delivered to Adelaide Division on broad gauge, transferred to Tasmania on narrow gauge in 1982, then back to SA on standard gauge in 1989 and then Whyalla in 2008 on narrow gauge. In 2012 is was delivered to Port Lincoln, the last loco delivered to the Eyre Peninsula and wearing Genesee & Wyoming decals on former AN livery. 5th July 2013.Jan 27, 2015
|
|

130705 0519135 viewsLock, former Australian National narrow gauge 830 class locomotive 846, an AE Goodwin built ALCo DL531 model with serial 84715 built new for the SAR in 1963 and delivered to Adelaide Division on broad gauge, transferred to Tasmania on narrow gauge in 1982, then back to SA on standard gauge in 1989 and then Whyalla in 2008 on narrow gauge. In 2012 is was delivered to Port Lincoln, the last loco delivered to the Eyre Peninsula and wearing Genesee & Wyoming decals on former AN livery. 5th July 2013.Jan 27, 2015
|
|

130705 0518125 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0517121 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0516112 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0515127 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0514147 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0513126 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0512120 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0511133 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
|
|

130705 0510132 viewsLock, the heavy fog has lifted and EMD 1200 class unit 1203 is leading the loading of a grain train on the grain loop road with two ALCo DL531 units 846 and 859.Jan 27, 2015
|
|

130704 0506127 viewsMoule, view of the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
|
|

130704 050583 viewsMoule, view looking east from the eastern end of the crossing loop with the point lever and indicator. The small 30 sign is the speed limit, the grade crossing is to access the ballast stockpile area. 4th July 2013.Jan 27, 2015
|
|

130704 050481 viewsMoule, Trak-Lok M7.5 steel sleeper for 31 kg/m rail manufactured by BHP in 1996, the 7.5 is the thickness in millimetres of the steel used. 4th July 2013.Jan 27, 2015
|
|

130704 050394 viewsMoule, yard overview looking west from the east end points of the crossing loop, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left point lever and indicator, the crossing loop on the right and then the ballast pile in the distance. Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 050291 viewsMoule, view of the point lever and indicator with the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
|
|

130704 050182 viewsMoule, view of the point lever and indicator with the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
|
|

130704 050077 viewsMoule, looking east at the east end points for the crossing loop, grade crossing is for access to ballast stockpile area, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 049979 viewsMoule, looking east, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the end of the ballast siding with the crossing loop rejoining the mainline just before the grade crossing to access the ballast stockpile area. Location is here. 4th July 2013.Jan 27, 2015
|
|

130704 049879 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.Jan 27, 2015
|
|
16608 files on 831 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
518 |  |
 |
 |
 |
 |
 |
 |
|