Last additions |
060111 230665 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.Jan 27, 2015
|
|
060111 230460 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.Jan 27, 2015
|
|
060111 230370 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo. 11th January 2006.Jan 27, 2015
|
|
060111 230273 viewsLock, an empty Clyde Engineering built EMD G12C model loco 1203 serial 65-427 leads two ALCo 830 class units 850 and 905. Their next shunt will be Warramboo as they pass the 147 km post. 11th January 2006.Jan 27, 2015
|
|
060111 230163 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|
060111 230067 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|
060111 229975 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|
060111 229875 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|
060111 229793 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|
060111 229698 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|
060111 2295161 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|
060111 229490 viewsLock, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 with two ALCO units 850 and 905 drag their grain train over the grade past the location sign and down into Lock. 11th January 2006.Jan 27, 2015
|
|
060111 229396 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|
060111 229271 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|
060111 229175 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|
060111 229073 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|
060111 228962 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|
060111 228863 viewsWarrachie, ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004 leads an empty grain train between Murdinga and Lock. 11th January 2006.Jan 27, 2015
|
|
060111 228761 viewsMurdinga, empty grain train running through the station with the grain silos and loadout spout. 11th January 2006.Jan 27, 2015
|
|
060111 228570 viewsMurdinga, rounding the curve before entering the station environs empty grain train running north behind ARG 1200 class unit 1203, a Clyde Engineering EMD model G12C serial 65-427, one of fourteen originally built between 1960-65 for WAGR as their A class A 1513, fitted with dynamic brakes and financed by Western Mining Corporation, started working on the Eyre Peninsula in November 2004. 11th January 2006.Jan 27, 2015
|
|
16487 files on 825 page(s) |
|
|
|
|
|
|
|
|
541 | |
|
|
|
|
|
|
|