Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
030411_110106.jpg
030411 110106216 viewsKimba, station yard view looking south, point level is covered to allow road vehicles to travel over it as a tractor is sometimes used for shunting. The loadout spouts are evident along with the Ascom loadout silo and horizontal bunker beyond that.Jan 27, 2015
030411_110040.jpg
030411 110040230 viewsKimba, rail transport waggon ENFR 2, originally built as 40' flat waggon NRF 900 in 1943. Transferred to Eyre Peninsula in 1984 and recoded to ENFR in 1985. Scrapped here at Kimba in 2005.Jan 27, 2015
030411_110018.jpg
030411 110018225 viewsKimba, rail recovery winch waggon EZWL 2, built using underframe of broad gauge horse box BH 4331. To Eyre Peninsula 1992, recoded then from AZWL.Jan 27, 2015
030411_110005.jpg
030411 110005333 viewsKimba, rail recovery winch waggon EZWL 2, shows cabin mounted above motor, built using underframe of broad gauge horse box BH 4331. To Eyre Peninsula 1992, recoded then from AZWL. Scrapped in 2005.Jan 27, 2015
030411_105938.jpg
030411 105938338 viewsKimba, rail recovery waggon set with winch waggon EZWL 2, eight ENFR type and one ENFB type waggons. The cabin is mounted above the motor, built using underframe of broad gauge horse box BH 4331. To Eyre Peninsula 1992, re-coded then from AZWL. Scrapped in 2005.Jan 27, 2015
030411_105925.jpg
030411 105925320 viewsKimba, rail recovery winch waggon EZWL 2, built using underframe of broad gauge horse box BH 4331. To Eyre Peninsula 1992, recoded then from AZWL. Scrapped in 2005.Jan 27, 2015
030411_105828.jpg
030411 105828324 viewsKimba, station yard, view of rail transport set in the loading road, winch waggon, dumbbell point indicator. Barracks visible behind indicator, station building in the distance.Jan 27, 2015
030411_105754.jpg
030411 105754355 viewsKimba, station yard view looking south from Kimba Terrace, gang shed on the right, winch waggon visible and silos on the left.Jan 27, 2015
030411_105119.jpg
030411 105119362 viewsKimba Grain Bunker site, overview of arrangement. Former Cortlinye shelter placed for crew, lighting tower for night time operation and the yellow auger goes to the over rail loadout bin.Jan 27, 2015
030411_105103.jpg
030411 105103461 viewsKimba Grain Bunker site, overhead mainline loading bin, looking south towards Kimba, augers from the storage area on the left.Jan 27, 2015
030411_105041.jpg
030411 105041350 viewsKimba Grain Bunker site with the Cortlinye shelter placed beside the line for crews to occupy.Jan 27, 2015
030411_102244.jpg
030411 102244339 viewsKimba Grain Bunker, looking towards Kimba, grain train loading with HBN type dual service ballast / grain hopper.Jan 27, 2015
030411_102226.jpg
030411 102226327 viewsKimba Grain Bunker, looking towards Kimba, grain train loading with HBN type dual service ballast / grain hopper.Jan 27, 2015
030411_102212.jpg
030411 102212349 viewsKimba Grain Bunker, looking towards Kimba, grain train loading with HBN type dual service ballast / grain hopper.Jan 27, 2015
030411_102054.jpg
030411 102054390 viewsKimba Grain Bunker, looking towards Kimba with Aerodrome Rd in the distance, ALCo DL531G/1 model rebuilt from an AE Goodwin made ALCo DL531 48 class 4813 serial 83713, issued to Eyre Peninsula from new in March 1966, and two 830 class units, 871 and 872 prepare to depart with a loaded. 11th April 2003. Geodata here.Jan 27, 2015
030411_101952.jpg
030411 101952366 viewsKimba Grain Bunker, ALCo DL531G/1 model rebuilt from an AE Goodwin made ALCo DL531 48 class 4813 serial 83713, issued to Eyre Peninsula from new in March 1966, 11th April 2003. Geodata here.Jan 27, 2015
030411_101932.jpg
030411 101932331 viewsKimba Grain Bunker, ALCo DL531 model built by AE Goodwin NSW as 830 class 872 serial G3422-2, issued to Eyre Peninsula from new in March 1966, 11th April 2003. Geodata here.Jan 27, 2015
030411_101856.jpg
030411 101856363 viewsKimba Grain Bunker, ALCo DL531 model built by AE Goodwin NSW as 830 class 871 issued to Eyre Peninsula from new in February 1966, trailing view, 11th April 2003. Geodata here.Jan 27, 2015
030411_101736.jpg
030411 101736433 viewsKimba Grain Bunker, train loading is almost complete with triple ALCo combination of 830 classes 871 and 872 and DA 7, model DL 531G/1, converted from 4813. 11th April 2003. Geodata here.Jan 27, 2015
030411_085336.jpg
030411 085336357 viewsBuckleboo, the end of the line looking south around the curve to the station, a once planned extension onto the Pinkawillinie lands never proceeded. Geodata here. The silos are a bit washed out due to the drizzly conditions.Jan 27, 2015
16911 files on 846 page(s) 575

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional