Last additions |

191-06406 viewsSeymour station, rationalised yard, V/Line T class unit T 410 Clyde Engineering EMD model G8B serial 68-626 coupled behind A class A 66 with a stabled down Wodonga goods train, Sunday.Oct 03, 2015
|
|

191-05386 viewsSeymour station, rationalised yard, V/Line A class unit A 66 Clyde Engineering EMD rebuild model AAT22C-2R serial 84-1186 coupled to stablemate model G8B T class T 410 serial 68-626 with a stabled down Wodonga goods train, Sunday.Oct 03, 2015
|
|

191-04393 viewsSeymour station, rationalised yard, V/Line A class unit A 66 Clyde Engineering EMD rebuild model AAT22C-2R serial 84-1186 leads T class T 410 with a stabled down Wodonga goods train.Oct 03, 2015
|
|

191-03417 viewsSeymour station, rationalised yard, V/Line A class A 70 Clyde Engineering EMD rebuild model AAT22C-2R serial 84-1187, ex ML2 unit B 70 ML2-11 awaits the evening Cobram down pass.Oct 03, 2015
|
|

191-01362 viewsWandong, O'Gradys Road grade crossing, near former Mathiesons Siding, UP Melbourne Express hauled by V/Line G class.Oct 03, 2015
|
|

191-02377 viewsWandong, Road grade crossing, near former Mathiesons Siding, UP Melbourne Express behind standard early 1990s V/Line G class power of Clyde Engineering built EMD model JT26C-2SS, G 521 serial 85-1234.Oct 03, 2015
|
|

221-37338 viewsYandi One mine loadout balloon loop, front on view of near new General Electric AC6000 unit 6074 serial 51066 as it loads a train.Sep 19, 2015
|
|

221-36323 viewsYandi One mine loadout balloon loop, front on view of near new General Electric AC6000 unit 6074 serial 51066 as it loads a train.Sep 19, 2015
|
|

221-35342 viewsYandi One mine loadout balloon loop, view out the cab window from near new General Electric AC6000 unit 6074 serial 51066.Sep 19, 2015
|
|

221-34349 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
|
|

221-33306 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
|
|

221-32327 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
|
|

221-31325 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
|
|

221-30321 viewsYandi One mine loadout balloon loop, near new General Electric AC6000 unit 6074 serial 51066 leads sister unit 6071 serial 51063 at the Y312.1 km crossing while controlling a train being loaded.Sep 19, 2015
|
|

221-29317 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.Sep 19, 2015
|
|

221-28320 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.Sep 19, 2015
|
|

221-27307 viewsYandi One mine loadout balloon loop, a pair of General Electric AC6000 units lead a train being loaded around the balloon, overview of the stockpile with stacker fill the hole from loading.Sep 19, 2015
|
|

221-26300 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
|
|

221-25302 viewsYandi One mine loadout balloon loop, General Electric AC6000 class emerges from the loadout portal at 0.9 km/h as it leads a train through the loading vaults, the dust extraction ducting is also visible.Sep 19, 2015
|
|

221-24331 viewsYandi One mine loadout balloon loop, overview of the stockpile, the train can be seen in the middle distance on the right.Sep 19, 2015
|
|
| 19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
575 |  |
 |
 |
 |
 |
 |
 |
|