Last additions |

130705 0599321 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
|
|

130705 0597315 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
|
|

130705 0598319 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
|
|

130705 0595313 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
|
|

130705 0596314 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
|
|

130705 0593308 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
|
|

130705 0594316 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
|
|

130705 0592314 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
|
|

130705 0591324 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
|
|

130705 0590325 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
|
|

130705 0589338 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
|
|

130705 0588331 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
|
|

130705 0587309 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
|
|

130705 0586299 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.Jan 27, 2015
|
|

130705 0585328 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.Jan 27, 2015
|
|

130705 0584352 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.Jan 27, 2015
|
|

130705 0583347 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.Jan 27, 2015
|
|

130705 0581312 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.Jan 27, 2015
|
|

130705 0582301 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.Jan 27, 2015
|
|

130705 0580321 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left background is the Ascom silo complex (Block 5), then blocks 2, 1 and 3, the train is on the mainline with the horizontal bunker (Block 4) on the right. 5th of July 2013.Jan 27, 2015
|
|
| 19087 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
638 |  |
 |
 |
 |
 |
 |
 |
|