Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
130705_0605.jpg
130705 0605435 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0606.jpg
130705 0606386 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0603.jpg
130705 0603425 viewsLock, located at the 148.5 km and originally named Terre when opened in May 1913, later renamed to Lock in December 1921. From the left is the concrete toilet block, Ascom silo complex (Block 5), the train is loading on the grain loop, loaded rake on the mainline, horizontal bunker (Block 4) and the crew barracks. 5th July 2013.Jan 27, 2015
130705_0604.jpg
130705 0604318 viewsLock, up end looking down through Lock, Viterra fast loader loading train while loaded portion sits on the mainline.Jan 27, 2015
130705_0601.jpg
130705 0601366 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0602.jpg
130705 0602366 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0600.jpg
130705 0600364 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0599.jpg
130705 0599366 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0597.jpg
130705 0597364 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0598.jpg
130705 0598351 viewsLock, down end looking up towards Port Lincoln with silo blocks #5 and #1 with loading taking place, the horizontal bunker #4 is on the left where the overhead augers are going. Loaded portion sitting on the mainline.Jan 27, 2015
130705_0595.jpg
130705 0595347 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0596.jpg
130705 0596351 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0593.jpg
130705 0593357 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0594.jpg
130705 0594360 viewsLock, down end looking up towards Port Lincoln with the four silo blocks on the right, from the furthest, #5, #1, #2 and #3. The horizontal bunker #4 is on the left but obscured by the trees. Loading is continuing on the #1 goods siding while the loaded rake is on the mainline.Jan 27, 2015
130705_0592.jpg
130705 0592345 viewsLock, having stowed the loaded portion on the mainline, the three locos 1203, 846 and 859 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0591.jpg
130705 0591372 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0590.jpg
130705 0590378 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0589.jpg
130705 0589381 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0588.jpg
130705 0588392 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
130705_0587.jpg
130705 0587378 viewsLock, having stowed the loaded portion on the mainline, the three locos 859, 846 and 1203 shunt back on to the empty portion on goods siding #1. Jan 27, 2015
19134 files on 957 page(s) 640

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional