Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
130705_0517.jpg
130705 0517317 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0516.jpg
130705 0516309 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0515.jpg
130705 0515324 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0514.jpg
130705 0514324 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0513.jpg
130705 0513318 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0512.jpg
130705 0512315 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0511.jpg
130705 0511349 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0510.jpg
130705 0510319 viewsLock, the heavy fog has lifted and EMD 1200 class unit 1203 is leading the loading of a grain train on the grain loop road with two ALCo DL531 units 846 and 859.Jan 27, 2015
130704_0506.jpg
130704 0506324 viewsMoule, view of the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
130704_0505.jpg
130704 0505284 viewsMoule, view looking east from the eastern end of the crossing loop with the point lever and indicator. The small 30 sign is the speed limit, the grade crossing is to access the ballast stockpile area. 4th July 2013.Jan 27, 2015
130704_0504.jpg
130704 0504274 viewsMoule, Trak-Lok M7.5 steel sleeper for 31 kg/m rail manufactured by BHP in 1996, the 7.5 is the thickness in millimetres of the steel used. 4th July 2013.Jan 27, 2015
130704_0503.jpg
130704 0503284 viewsMoule, yard overview looking west from the east end points of the crossing loop, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left point lever and indicator, the crossing loop on the right and then the ballast pile in the distance. Location is here. 4th July 2013.Jan 27, 2015
130704_0502.jpg
130704 0502272 viewsMoule, view of the point lever and indicator with the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
130704_0501.jpg
130704 0501300 viewsMoule, view of the point lever and indicator with the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
130704_0500.jpg
130704 0500283 viewsMoule, looking east at the east end points for the crossing loop, grade crossing is for access to ballast stockpile area, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. Location is here. 4th July 2013.Jan 27, 2015
130704_0499.jpg
130704 0499299 viewsMoule, looking east, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the end of the ballast siding with the crossing loop rejoining the mainline just before the grade crossing to access the ballast stockpile area. Location is here. 4th July 2013.Jan 27, 2015
130704_0498.jpg
130704 0498279 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.Jan 27, 2015
130704_0497.jpg
130704 0497270 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.Jan 27, 2015
130704_0496.jpg
130704 0496266 viewsMoule, yard view looking east from the western end of the loop towards the 446 km, crossing loop on the left, heavy track wear is evident. Location here, 4th July 2013.Jan 27, 2015
130704_0495.jpg
130704 0495277 viewsMoule, looking west towards Charra and Kevin at the 446 km, with the crossing loop on the right. Location here, 4th July 2013.Jan 27, 2015
19085 files on 955 page(s) 642

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional