Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
130705_0512.jpg
130705 0512426 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0511.jpg
130705 0511462 viewsLock, grain train loading in progress with the Viterra fast flow auger in the distance, the train with 1203, 846 and 859 is about to split and shunt half the consist onto the mainline. 5th of July 2013.Jan 27, 2015
130705_0510.jpg
130705 0510462 viewsLock, the heavy fog has lifted and EMD 1200 class unit 1203 is leading the loading of a grain train on the grain loop road with two ALCo DL531 units 846 and 859.Jan 27, 2015
130704_0506.jpg
130704 0506427 viewsMoule, view of the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
130704_0505.jpg
130704 0505412 viewsMoule, view looking east from the eastern end of the crossing loop with the point lever and indicator. The small 30 sign is the speed limit, the grade crossing is to access the ballast stockpile area. 4th July 2013.Jan 27, 2015
130704_0504.jpg
130704 0504379 viewsMoule, Trak-Lok M7.5 steel sleeper for 31 kg/m rail manufactured by BHP in 1996, the 7.5 is the thickness in millimetres of the steel used. 4th July 2013.Jan 27, 2015
130704_0503.jpg
130704 0503389 viewsMoule, yard overview looking west from the east end points of the crossing loop, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left point lever and indicator, the crossing loop on the right and then the ballast pile in the distance. Location is here. 4th July 2013.Jan 27, 2015
130704_0502.jpg
130704 0502377 viewsMoule, view of the point lever and indicator with the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
130704_0501.jpg
130704 0501401 viewsMoule, view of the point lever and indicator with the massive silo complex of Thevenard in the distance across the water, they are approximately 13 km away, location here. 4th July 2013.Jan 27, 2015
130704_0500.jpg
130704 0500394 viewsMoule, looking east at the east end points for the crossing loop, grade crossing is for access to ballast stockpile area, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. Location is here. 4th July 2013.Jan 27, 2015
130704_0499.jpg
130704 0499415 viewsMoule, looking east, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the end of the ballast siding with the crossing loop rejoining the mainline just before the grade crossing to access the ballast stockpile area. Location is here. 4th July 2013.Jan 27, 2015
130704_0498.jpg
130704 0498404 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.Jan 27, 2015
130704_0497.jpg
130704 0497376 viewsMoule, view of the General Railway Signal Company point lever and indicator at the western end of the crossing loop. Location here, 4th July 2013.Jan 27, 2015
130704_0496.jpg
130704 0496388 viewsMoule, yard view looking east from the western end of the loop towards the 446 km, crossing loop on the left, heavy track wear is evident. Location here, 4th July 2013.Jan 27, 2015
130704_0495.jpg
130704 0495383 viewsMoule, looking west towards Charra and Kevin at the 446 km, with the crossing loop on the right. Location here, 4th July 2013.Jan 27, 2015
130704_0494.jpg
130704 0494349 viewsMoule, looking west towards Charra and Kevin along the roller coaster grades with the crossing loop on the right and the points for the ballast siding just behind the camera. Location here, 4th July 2013.Jan 27, 2015
130704_0493.jpg
130704 0493402 viewsMoule, yard view looking east from the points for the single ended ballast siding with ballast pile of the left. Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.Jan 27, 2015
130704_0492.jpg
130704 0492387 viewsMoule, yard view looking east from the points for the single ended ballast siding with ballast pile of the left. Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.Jan 27, 2015
130704_0491.jpg
130704 0491412 viewsMoule, Mallee style shelter shed as a station 'building' of sorts. Moule was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. It hosts a crossing loop and ballast loading siding, Location is here. 4th July 2013.Jan 27, 2015
130704_0489.jpg
130704 0489432 viewsMoule, yard overview looking west, Moule located at the 445.6 km was opened in February 1966 when the Direct Line between Ceduna and Kevin was opened. From the left is the Mallee style shelter shed, mainline, crossing loop and ballast siding. Location is here. 4th July 2013.Jan 27, 2015
19220 files on 961 page(s) 649

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional