Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
203-07.jpg
203-07250 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.Aug 16, 2014
203-06.jpg
203-06245 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. Cab side view with name board and steerable bogie.Aug 16, 2014
203-05.jpg
203-05298 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working.Aug 16, 2014
203-04.jpg
203-04417 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
203-01.jpg
203-01206 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
203-03.jpg
203-03265 viewsBing Siding, an empty train behind a pair of BHP General Electric AC6000 units 6076 'Mt Goldsworthy' serial 51068 and class leader 6070 'Port Hedland' serial 51062 run around the passing track up to the departure signal.Aug 16, 2014
203-02.jpg
203-02209 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
203-00.jpg
203-00267 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
202-33.jpg
202-33162 viewsYandi One, 307 km grade crossing, the last waggons on a loaded train, the last two are both Comeng style waggons, while the third, also being built by Comeng was originally built as a fixed wheel waggon with four axles, later converted to bogies.Aug 16, 2014
202-32.jpg
202-32156 viewsYandi One, 307 km grade crossing, mid-train remote CM40-8ML Goninan GE unit 5663 'Newcastle' serial 8412-08/94-154 was originally built 'cabless' but now fitted with one, also note the difference in the ALCo builds by the fuel tanks, 5666 was originally an M636C built by Comeng while 5663 was originally built by AE Goodwin.Aug 16, 2014
202-31.jpg
202-31168 viewsYandi One, 307 km grade crossing, mid-train remote CM40-8MEFI Goninan GE unit 5666 'Taranto' serial 8412-11/94-157 and CM40-8ML unit 5663 'Newcastle' show the difference in the ALCo builds by the fuel tanks, 5666 was originally an M636C built by Comeng while 5663 was originally built by AE Goodwin.Aug 16, 2014
202-30.jpg
202-30124 viewsYandi One, 307 km grade crossing sees a loaded train departing behind a CM40-8M and an CM40-8 unit with the rail grinder in the back track in the distance, the road curving around at the right goes to the Henry Walker camp.Aug 16, 2014
202-28.jpg
202-28134 viewsMeckering, looking east at the interlocking levers #1 and #2 and Pilot Key box 5B for the goods siding and derail at the east end of the crossing loop.Aug 16, 2014
202-29.jpg
202-29139 viewsYandi One, 307 km grade crossing sees a loaded train departing behind a CM40-8M and an CM40-8 unit with the rail grinder in the back track in the distance.Aug 16, 2014
202-26.jpg
202-26129 viewsMeckering, view looking east across the Mortlock River flood plain at the east end of the crossing loop, the east end only has a small interlocking relay cabinet and phone booth.Aug 16, 2014
202-27.jpg
202-27130 viewsMeckering, looking east at the Down departure signals for the loop 10 RB and the mainline 10 RA.Aug 16, 2014
202-24.jpg
202-24121 viewsMeckering, view looking east with the goods siding re-joining the goods loop and heading back to the crossing loop.Aug 16, 2014
202-25.jpg
202-25125 viewsMeckering, view looking east with the east end catch points and dwarf indicator for the goods loop and rodding heading towards the interlocked ground frame where it re-joins the crossing loop.Aug 16, 2014
202-23.jpg
202-23142 viewsMeckering, warning sign affixed to the goods crane.Aug 16, 2014
202-22.jpg
202-22131 viewsMeckering, manually operated goods loading crane, chain hoist, and loading ramp.Aug 16, 2014
16558 files on 828 page(s) 660

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional