Last additions |

060113 2539428 viewsKevin, 1600 class unit 1604 in Australian Railroad Group livery a Clyde Engineering built EMD JL22C model serial 71-731, originally built as NJ class NJ 4 and built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981, shunts back along the Penong line with the points indicator set for the siding and the goods siding on the right of the train. Kevin station area, as the train is reversed prior to loading on the mainline to Thevenard. 13th January 2006.Jan 27, 2015
|
|

060113 2538420 viewsKevin, 1600 class unit 1604 in Australian Railroad Group livery a Clyde Engineering built EMD JL22C model serial 71-731, originally built as NJ class NJ 4 and built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981, shunts back along the Penong line with the points indicator set for the siding and the goods siding on the right of the train. Kevin station area, as the train is reversed prior to loading on the mainline to Thevenard. 13th January 2006.Jan 27, 2015
|
|

060113 2537460 viewsKevin, 1600 class unit 1604 in Australian Railroad Group livery a Clyde Engineering built EMD JL22C model serial 71-731, originally built as NJ class NJ 4 and built for the Central Australia Railway in 1971, transferred to the Eyre Peninsula in 1981, shunts back along the Penong line past the station building, Mallee shelter - train control cabin, as the train is reversed prior to loading on the mainline to Thevenard. 13th January 2006.Jan 27, 2015
|
|

060113 2536395 viewsKevin, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 29, as the train shunts back along the Penong line, with the mainline in the foreground, as the train is reversed prior to loading. 13th January 2006.Jan 27, 2015
|
|

060113 2535417 viewsKevin, originally an Kinki Sharyo built NH type for the NAR now coded ENH type ENH 28, is the last car of an empty train as it shunts back along the Penong line past the station building, Mallee shelter - train control cabin, as the train is reversed prior to loading on the mainline to Thevenard. 13th January 2006.Jan 27, 2015
|
|

060113 2534469 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2533429 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2532403 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2531417 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2530409 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2529399 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2528396 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2527405 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2526398 viewsKevin, empty train 6DD3 is heading onto the south leg with some of the gypsum plant behind the train and a set of original loading bins gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2525395 viewsKevin, empty train 6DD3 is heading onto the south leg and original gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2524413 viewsKevin, empty train 6DD3 is heading onto the south leg and original gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2523424 viewsKevin, empty train 6DD3 is heading onto the south leg and original gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2522419 viewsKevin, empty train 6DD3 is heading onto the south leg and original gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2521455 viewsKevin, empty train 6DD3 is heading onto the south leg and original gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|

060113 2520452 viewsKevin, empty train 6DD3 is on the west leg of the triangle as it prepares to pull forward and head south towards original gypsum loading siding to continue the reversing process. 13th January 2006.Jan 27, 2015
|
|
| 19220 files on 961 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
666 |  |
 |
 |
 |
 |
 |
 |
|