Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
202-14.jpg
202-14330 viewsMeckering, view looing east at the catch points and dwarf indicator at the west end of the goods siding, grain bunker and silos with the goods shed and station visible in the distance.Aug 16, 2014
202-13.jpg
202-13331 viewsMeckering, overview of the interlocking ground frame, 5A Pilot Key and associated rodding and infrastructure for the west end of the goods siding.Aug 16, 2014
202-12.jpg
202-12345 viewsMeckering, looking east at the interlocking levers #1 and #2 and Pilot Key box 5A for the goods siding and derail at the west end of the crossing loop.Aug 16, 2014
202-11.jpg
202-11336 viewsMeckering, interlocking arrangement for the grain siding, west end points off the crossing loop.Aug 16, 2014
202-10.jpg
202-10359 viewsMeckering, former narrow gauge bridge located south of the standard gauge line.Aug 16, 2014
202-09.jpg
202-09309 viewsMeckering, looking east with the mainline on the right and the crossing loop on the left and the back of Up departure signals, 2 RA on the right and 2 RB on the left.Aug 16, 2014
202-08.jpg
202-08352 viewsMeckering, relay interlocking room, exhaust can be seen through wall, door is marked for Telephone, Crankhandle and Pilot Key.Aug 16, 2014
202-07.jpg
202-07345 viewsMeckering, looking east, the points for the crossing loop with dual control point machine and relay interlocking room which houses the backup power plant, silos in the distance.Aug 16, 2014
202-06.jpg
202-06332 viewsMeckering, looking east at the Down arrival signal mast, 2 RA and 2 RB, relay room and grain silos in the distance.Aug 16, 2014
202-05.jpg
202-05363 viewsMeckering, looking west towards Grass Valley and Perth, the Up departure CTC signals, 2 LA for the main and 2 LB for the loop.Aug 16, 2014
202-03.jpg
202-03361 viewsMeckering, looking east along the goods siding with the good shed loop points, shed and crane in the distance.Aug 16, 2014
202-04.jpg
202-04334 viewsMeckering, looking east on the crossing loop, goods shed and sidings at left, station building at right.Aug 16, 2014
202-02.jpg
202-02351 viewsMeckering, view across standard gauge tracks at the original standard gauge brick station - waiting shelter.Aug 16, 2014
201-37.jpg
201-37275 viewsMidland, two brand Goninan WA built GE Cv40-9i model NR class units NR 102 serial 7250-07/97-302 and NR 101 serial 7250-07/97-303 with the original Perth built NR 61 serial 7250-11/96-263 as they await departure with RQRX type waggon RQRX 60177.Aug 16, 2014
201-36.jpg
201-36270 viewsMidland, narrow gauge Westrail D class locomotive D 1565, a Clyde Engineering built EMD model G26C serial 70-727 returns long end leading with empty coal train consisting of seventeen XY type bogie coal hoppers bound for Collie.Aug 16, 2014
201-35.jpg
201-35242 viewsMidland, three quarter view of RQRX type waggon RQRX 60177 53 tonne capacity flat waggon coupled to new NR class NR 102, RQRX was converted from NQBX type NQBX 21782.Aug 16, 2014
201-34.jpg
201-34245 viewsMidland, two brand Goninan WA built GE Cv40-9i model NR class units NR 102 serial 7250-07/97-302 and NR 101 serial 7250-07/97-303 with the original Perth built NR 61 serial 7250-11/96-263 as they await departure with RQRX type waggon RQRX 60177.Aug 16, 2014
201-33.jpg
201-33235 viewsMidland, two brand Goninan WA built GE Cv40-9i model NR class units NR 102 serial 7250-07/97-302 and NR 101 serial 7250-07/97-303 with the original Perth built NR 61 serial 7250-11/96-263 as they await departure.Aug 16, 2014
201-32.jpg
201-32248 viewsMidland, three quarter view of RQRX type waggon RQRX 60177 53 tonne capacity flat waggon coupled to new NR class NR 102, RQRX was converted from NQBX type NQBX 21782.Aug 16, 2014
201-31.jpg
201-31237 viewsMidland, the first Perth built NR class NR 61 Goninan GE model Cv40-9i serial 7250-11/96-263 waits to depart Midland yard a brand new NR unit as the drivers talk to Control, the MidSig train control building is in the distance.Aug 16, 2014
16911 files on 846 page(s) 679

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional