Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
190-16.jpg
190-16229 viewsCootamundra, NSW Main South, departmental waggon W 1569, a loaded NHBF type bogie ballast waggon NHBF 1569 with a Comeng plate.May 16, 2014
190-15.jpg
190-15238 viewsCootamundra, NSW Main South, departmental waggon W 1195, a loaded NHWF type bogie ballast waggon NHWF 1195.May 16, 2014
190-13.jpg
190-13204 viewsCootamundra, NSW Main South, NSSF type bogie sheep waggon NSSF 30004, originally built by AE Goodwin as BSV type.May 16, 2014
190-14.jpg
190-14224 viewsCootamundra, NSW Main South, a loaded rake of ballast hoppers.May 16, 2014
190-12.jpg
190-12234 viewsCootamundra, NSW Main South, a rake of sheep NSSF type waggons.May 16, 2014
190-11.jpg
190-11217 viewsCootamundra, NSW Main South, looking south, with the Sorting Sidings at left, and main yard in the middle, mainlines at right with the Down Refuge running down the middle of image.May 16, 2014
190-10.jpg
190-10213 viewsCootamundra, NSW Main South, looking south with the grain loading area and Ascom silo complex and the yard with rakes of stored waggons.May 16, 2014
190-09.jpg
190-09206 viewsCootamundra, NSW Main South, looking north at the 429 km post, North signal box across Pinkerton Rd with the impressive north signal gantry.May 16, 2014
190-08.jpg
190-08202 viewsCootamundra, NSW Main South, looking from the mainlines across the yard in a north direction, two mechanical lower quadrant semaphore signal posts protect up movements from the yard.May 16, 2014
190-07.jpg
190-07228 viewsCootamundra, NSW Main South, still looking north, another mechanical lower quadrant semaphore signal gantry.May 16, 2014
190-06.jpg
190-06228 viewsCootamundra, NSW Main South, looking north, further north from 190-05, shows rear of mechanical lower quadrant semaphore signal post.May 16, 2014
190-05.jpg
190-05286 viewsCootamundra, NSW Main South, looking north, signal gantry with standpipe foundation in front, platform behind, dock road on the left.May 16, 2014
190-03.jpg
190-03227 viewsCootamundra, NSW Main South, looking north, platform and main lines on the left, yard tracks on the right with Ascom silo complex in the background.May 16, 2014
190-04.jpg
190-04243 viewsCootamundra, NSW Main South, looking south along the mainlines, South box in the distance.May 16, 2014
190-02.jpg
190-02300 viewsCootamundra, NSW Main South, looking south from the pedestrian footbridge, loco depot and sanding tower on the left, South signal box in the distance with a rake of NTBX vans.May 16, 2014
190-01.jpg
190-01264 viewsCootamundra, NSW Main South, looking south from the pedestrian footbridge, past loco depot, turntable visible with sanding tower.May 16, 2014
189-19.jpg
189-19193 viewsYerong Creek, located at the 565.08 km on the NSW Main South line, view looking south along the Loop with Mainline at left and Goods Siding coming in from the right.May 14, 2014
189-18.jpg
189-18180 viewsYerong Creek, located at the 565.08 km on the NSW Main South line, view looking north at the remains of the station platform, one sign has been snapped in half.May 14, 2014
189-17.jpg
189-17194 viewsYerong Creek, located at the 565.08 km on the NSW Main South line, view looking south along the mainline, then the Loop and Goods Siding with stored car carrying waggons, ground frame C and the points from the loop to siding.May 14, 2014
189-16.jpg
189-16193 viewsYerong Creek, located at the 565.08 km on the NSW Main South line, view looking north along the mainline, then the Loop and Goods Siding with stored car carrying waggons.May 14, 2014
16487 files on 825 page(s) 681

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2024 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional