Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
051102_6616.jpg
051102 6616601 viewsThevenard, AE Goodwin ALCo model DL531 830 class locomotive 871 serial G3422-1, issued when built in 1966 to the Eyre Peninsula division of South Australian Railways. Still wearing Australian National green and yellow but with ASR decals as it stands in the yard.Jan 27, 2015
051102_6614.jpg
051102 6614609 viewsThevenard Maintenance Centre has NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad.Jan 27, 2015
051102_6613.jpg
051102 6613830 viewsThevenard Maintenance Centre has NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad and a lone ENH type hopper standing around 'on-shed'.Jan 27, 2015
051102_6611.jpg
051102 6611811 viewsThevenard, AE Goodwin ALCo model DL531 830 class locomotive 871 serial G3422-1, issued when built in 1966 to the Eyre Peninsula division of South Australian Railways. Still wearing Australian National green and yellow but with ASR decals as it stands in the yard coupled to an ENBA type louvre van.Jan 27, 2015
051102_6612.jpg
051102 6612578 viewsThevenard, cab side of AE Goodwin ALCo model DL531 830 class locomotive 871 serial G3422-1, issued when built in 1966 to the Eyre Peninsula division of South Australian Railways. Still wearing Australian National green and yellow but with ASR decals as it stands in the yard coupled to an ENBA type louvre van.Jan 27, 2015
030415_071138.jpg
030415 071138651 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.Jan 27, 2015
030415_071146.jpg
030415 071146708 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.Jan 27, 2015
030415_070420.jpg
030415 070420822 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit serial 71-732, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.Jan 27, 2015
030415_070408.jpg
030415 070408833 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. In the background are the old loading bins. At the Kevin loading point.Jan 27, 2015
030415_065944.jpg
030415 065944845 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 6 serial 71-733, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.Jan 27, 2015
030415_070041.jpg
030415 070041662 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit serial 71-732, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.Jan 27, 2015
030415_065924.jpg
030415 065924810 viewsKevin, NJ class Clyde Engineering EMD JL22C model unit NJ 3 serial 71-730, built in 1971 at Clyde's Granville NSW workshops, started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. Still in AN green but lettered for Australian Southern Railroad. At the Kevin loading point.Jan 27, 2015
030415_065911.jpg
030415 065911929 viewsKevin, originally one of sixty two Kinki Sharyo built NH type for the NAR in 1966, sent to Eyre Peninsula in 1985 and recoded to ENH type, ENH 11 with hungry boards fitted and loaded with gypsum on train 3DD2 at the Kevin loading point.Jan 27, 2015
030415_065626.jpg
030415 065626615 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units NJ 5 serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.Jan 27, 2015
030415_065601.jpg
030415 065601664 viewsKevin, loading is almost complete 0700 hrs. as gypsum train 3DD2 stands behind triple NJ class Clyde Engineering EMD JL22C model units NJ 5 serial 71-732, NJ 6 serial 71-733 and NJ 3 serial 71-730, these units built in 1971 at Clyde's Granville workshops started out on the Central Australia Railway for the Commonwealth Railways before being transferred to the Eyre Peninsula system in 1981. At the Kevin loading point.Jan 27, 2015
030414_165816.jpg
030414 165816482 viewsPenong, former power station, couple of Stobie poles out the front.Jan 27, 2015
030414_165751.jpg
030414 165751468 viewsPenong, former power station shed.Jan 27, 2015
030414_165722.jpg
030414 165722443 viewsPenong, power station sign.Jan 27, 2015
030414_164137.jpg
030414 164137453 viewsKevin, , overview looking east back towards the gypsum fields and plant from the end of the loop on the line to Penong.Jan 27, 2015
030414_163944.jpg
030414 163944495 viewsKevin, looking south at the gypsum plant, the triangle can be seen branching off on the right, loop on the left, the mainline to Penong continues on behind the camera.Jan 27, 2015
19220 files on 961 page(s) 687

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional