Last additions |

030406 084446439 viewsTooligie, yard view looking across mainline to siding and loading ramp, weighbridge scale room in the right background. 6th April 2003.Jan 27, 2015
|
|

030406 084350451 viewsTooligie, elevation view of the concrete style silo complex and outflow spout, Block 1, station train control cabin and loading ramp visible on the left. 6th April 2003.Jan 27, 2015
|
|

030406 083954487 viewsTooligie, yard overview looking south from the north end points, point lever and indicator, Ascom style silo complex with outflow hopper and spout, Block 2, with concrete silo complex, Block 1, beside them. 6th April 2003.Jan 27, 2015
|
|

030406 084217471 viewsTooligie, station located at the 113.4 km, originally opened May 1913, train control cabin and waiting room - shelter with station name board, 6th April 2003.Jan 27, 2015
|
|

030406 082802430 viewsMurdinga, track view looking south across the grade crossing for Murlong Rd, points, indicator and lever, 6th April 2003.Jan 27, 2015
|
|

030406 082752414 viewsMurdinga, yard overview looking north from the south end with the grain loop branching off on the right, concrete silo complex with horizontal grain shed and Ascom style steel silo complexes with outflow spout and gantry visible. 6th April 2003Jan 27, 2015
|
|

030406 082605474 viewsMurdinga, yard view looking south, typical track condition with short bolted rail lengths, grade crossing for Murlong Rd in the distance. 6th April 2003.Jan 27, 2015
|
|

030406 082620485 viewsMurdinga, station located at the 128.2 km, originally opened December 1935 and originally referred to as Corunna, front elevation view of train control cabin and waiting room - shelter with station name board, 6th April 2003.Jan 27, 2015
|
|

030406 082550446 viewsMurdinga, station located at the 128.2 km, originally opened December 1935 and originally referred to as Corunna, train control cabin and waiting room - shelter with station name board, 6th April 2003.Jan 27, 2015
|
|

030406 082337469 viewsMurdinga, yard overview looking south down the mainline from the north end, points and point lever and indicator with Pope Searle, grain siding and silo complex with out-loading spout on gantry over both tracks. 6th April 2003.Jan 27, 2015
|
|

030406 082324487 viewsMurdinga, yard overview looking south down the mainline from the north end, with grain siding and silo complex with outflow spout on gantry over both tracks. 6th April 2003.Jan 27, 2015
|
|

030406 081444484 viewsMurdinga, looking north from the north end, 6th April 2003.Jan 27, 2015
|
|

030405 165918373 viewsWudinna, internal view of the train control cabin with desk and phone box for receiving train orders, 5th April 2003Jan 27, 2015
|
|

030405 165414354 viewsLock, sign on the barracks indicating the current operator, 5th April 2003.Jan 27, 2015
|
|

030405 161744351 viewsLock, capacity sign mounted on former yard crane indicating 5 tons and the radius of the jib. 5th April 2003.Jan 27, 2015
|
|

030405 161712325 viewsLock, view from the site where the former yard crane in located, along North Terrace, looking east towards the silo complexes, 5th April 2003.Jan 27, 2015
|
|

030405 161656334 viewsLock, former yard crane, hand operated 5 ton revolving jib crane and plinth, now located off North Terrace, 5th April 2003.Jan 27, 2015
|
|

030405 161108348 viewsLock and District Historical Museum, rear view of former Lock railway station portable office building, 5th April 2003.Jan 27, 2015
|
|

030405 160954370 viewsLock and District Historical Museum, former Lock railway station portable office building with original Peachna station sign, 5th April 2003.Jan 27, 2015
|
|

030405 160936342 viewsLock and District Historical Museum, original Peachna railway station sign on the side of the former lock portable station office building. 5th April 2003.Jan 27, 2015
|
|
19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
699 |  |
 |
 |
 |
 |
 |
 |
|