Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
199-03.jpg
199-03408 viewsToodyay West, empty grain train with standard gauge Westrail L class L 263 Clyde Engineering EMD GT26C serial 68-553 and forty empty waggons at Northam-Toodyay Rd Katrine. 1316 hrs on 21st June 1997.Aug 16, 2014
199-04.jpg
199-04391 viewsMeckering, National Rail NR class units NR 19 and NR 20 both being Goninan built GE Cv40-9i models head up train 7PM5 as they wait for a cross with the Prospector in the loop 1400 hrs 21st June 1997.Aug 16, 2014
199-02.jpg
199-02413 viewsToodyay West, empty grain train with standard gauge Westrail L class L 263 Clyde Engineering EMD GT26C serial 68-553 and forty empty waggons at Northam-Toodyay Rd Katrine. 1316 hrs on 21st June 1997.Aug 16, 2014
199-01.jpg
199-01401 viewsToodyay West, empty grain train with standard gauge Westrail L class L 263 Clyde Engineering EMD GT26C serial 68-553 and forty empty waggons at Northam-Toodyay Rd Katrine. 1316 hrs on 21st June 1997.Aug 16, 2014
198-36.jpg
198-36335 viewsPort Hedland Port, BHP Nelson Point view of A Berth looking towards Berth B with vessel being loaded on B Berth by Shiploader One.Aug 16, 2014
198-37.jpg
198-37321 viewsView of Nelson Point showing original plant, and conveyors etc.Aug 16, 2014
198-35.jpg
198-35285 viewsPort Hedland Port, BHP Nelson Point view of Berth B with vessel being loaded by Shiploader One.Aug 16, 2014
198-34.jpg
198-34313 viewsPort Hedland Port, BHP Nelson Point view of Berth B with vessel being loaded by Shiploader One.Aug 16, 2014
198-33.jpg
198-33285 viewsPort Hedland Port, view of ship turning basin with the South Hedland water tank in the distance, FMG now have a three berths in this location on the right. Early 2001.Aug 16, 2014
198-32.jpg
198-32314 viewsPort Hedland Port, view of ship turning basin with the South Hedland water tank in the distance, FMG now have a three berths in this location on the right. Early 2001.Aug 16, 2014
198-31.jpg
198-31294 viewsPort Hedland Port, view across harbour with now demolished HBI plant in the background, this plant was flattened in October 2011, this view is 2001, FMG have now built berths in this area and Roy Hill have a couple on the right.Aug 16, 2014
198-30.jpg
198-30271 viewsPort Hedland Port, view of the BHP HBI plant overland conveyor and under-harbour tunnel portal, also Utah Point Boat Ramp. This area is now changed with Pilbara Ports Authority No.4 Berth, and three additional berths for BHP Billiton. Images taken 2001.Aug 16, 2014
198-29.jpg
198-29279 viewsPort Hedland Port, view of Cargill Salt loader on No. 3 Berth, BHP under-harbour tunnel portal and overland conveyor for HBI plant visible along with Finucane Island, 2001.Aug 16, 2014
198-28.jpg
198-28278 viewsPort Hedland Port, view of manganese stockpile area with truck unloading, Cockburn Cement silos, old loader can just be made out in front of new bulk loader under construction, 2001.Aug 16, 2014
198-27.jpg
198-27291 viewsPort Hedland Port, view across hard stand area, shows tug pen and BHP Transport admin building, locals will also notice Customs House, new bulk loader under construction.Aug 16, 2014
198-26.jpg
198-26265 viewsPort Hedland Port, view of Port Control Tower, grassed area with shed is for helicopter operator, the Esplanade Hotel can also be seen along with the lookout tower behind the visitors centre.Aug 16, 2014
198-25.jpg
198-25297 viewsPort Hedland Port, view of Port Control Tower, grassed area with shed is for helicopter operator, the Esplanade Hotel can also be seen along with the lookout tower behind the visitors centre.Aug 16, 2014
198-24.jpg
198-24281 viewsPort Hedland Port, overview of the hard stand area, salt conveyor at very bottom of image. New bulk loader under construction, tug pen and BHP Transport admin building visible at top right. Circa 2001.Aug 16, 2014
198-23.jpg
198-23274 viewsPort Hedland Port, view of the hard stand and overview of the PHPA, manganese is stockpiled around the former Cockburn Cement silos, new bulk loader under construction, tug pen visible along with single berth at BHP Finucane Island.Aug 16, 2014
198-22.jpg
198-22294 viewsPort Hedland Port, view of the Cargill Salt berth and loader, or PHPA Berth No. 3, in this 2001 view, the then new bulker loader is under construction and manganese is stockpiled on the ground. The BHP Finucane Island berth is visible along with the overland conveyor for the HBI plant, in the far background is the admin building for BHP Transport the operator of the Tug Boats.Aug 16, 2014
18442 files on 923 page(s) 761

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional