Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Last additions
220-23.jpg
220-23400 viewsGoldsworthy Junction, a loaded train from Yarrie mine lead by BHP Dash 7 unit 5507 'Nimingarra' serial 4839-03 / 87-072 was rebuilt by Goninan WA from an ALCo C636 unit 5461 into GE model C36-7M in 1987.Dec 26, 2014
220-21.jpg
220-21424 viewsGoldsworthy Junction, a loaded train from Yarrie mine lead by BHP Dash 7 unit 5507 'Nimingarra' serial 4839-03 / 87-072 was rebuilt by Goninan WA from an ALCo C636 unit 5461 into GE model C36-7M in 1987.Dec 26, 2014
220-22.jpg
220-22423 viewsGoldsworthy Junction, a loaded train from Yarrie mine lead by BHP Dash 7 unit 5507 'Nimingarra' serial 4839-03 / 87-072 was rebuilt by Goninan WA from an ALCo C636 unit 5461 into GE model C36-7M in 1987.Dec 26, 2014
220-20.jpg
220-20493 viewsGoldsworthy Junction, looking north east along the Goldsworthy line as a loaded train ex Yarrie mine approaches rounding the curve, the grease pot for the curve behind the photographer is visible.Dec 26, 2014
220-19.jpg
220-19508 viewsTomlinson Steel WA built bottom discharge ore waggon 8115 loaded in the consist of a Yarrie train.Dec 26, 2014
220-18.jpg
220-18461 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.Dec 26, 2014
220-17.jpg
220-17463 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.Dec 26, 2014
220-16.jpg
220-16504 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.Dec 26, 2014
220-15.jpg
220-15498 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.Dec 26, 2014
220-14.jpg
220-14475 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.Dec 26, 2014
220-13.jpg
220-13474 viewsJust west of the 104.6 km crossing on the Yarrie line, BHP Iron Ore Goninan rebuilt ALCo C636 5431 into a C36-7M unit 5507 serial number 4839-03 / 87-072 seen here leading its loaded train through the curves.Dec 26, 2014
220-12.jpg
220-12430 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, hills, Toyota HJ75 Landcruiser.Dec 26, 2014
220-11.jpg
220-11511 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, looking towards Yarrie.Dec 26, 2014
220-10.jpg
220-10461 viewsShay Gap, Mable Bar Rd grade crossing at the 187.6 km on the line to Yarrie, looking towards Hedland.Dec 26, 2014
220-09.jpg
220-09481 viewsHills around former Shay Gap mining area.Dec 26, 2014
220-08.jpg
220-08489 viewsRubin Junction looking north from the Nimingarra Mine end of the triangle, the track to the left leads to Yarrie and the track to the right to Hedland.Dec 26, 2014
220-07.jpg
220-07518 viewsRubin Junction looking west from the eastern end, the line off to the right is the line to Nimingarra Mine with the straight continuing onto Hedland.Dec 26, 2014
220-06.jpg
220-06466 viewsRubin Junction looking east from the western end, the line off to the left is the line to Nimingarra Mine with the straight continuing onto Yarrie.Dec 26, 2014
220-05.jpg
220-05453 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking west past the Yard Limit sign and the 137.5 km grade crossing.Dec 26, 2014
220-04.jpg
220-04444 viewsTaplin Siding, located between the 135 and 137.5 km on the former Goldsworthy Mining Ltd line, now part of the BHP Iron Ore network looking west from the eastern end of the siding.Dec 26, 2014
19220 files on 961 page(s) 763

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2026 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional