Last additions |

203-14444 viewsBing Siding, a loaded BHP Iron Ore train with double Dash 8 power behind Goninan GE rebuild CM40-8M models 5660 'Kure' serial 8412-05 / 94-151 and sister 5643 'Mt Whaleback' serial no 8281-08 / 92-132 as they cross an empty train in the siding with an AC6000 unit.Aug 16, 2014
|
|

203-13420 viewsBing Siding, a loaded BHP Iron Ore train with a pair of CM40-8M units on the lead are on the mainline as the cross the empty train behind General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068.Aug 16, 2014
|
|

203-12426 viewsBing Siding, BHP Iron Ore General Electric AC6000 model 6076 'Mt Goldsworthy' serial 51068 with an empty train. Cab side view with name board, steerable bogie and Driver Cosgrove at the controls.Aug 16, 2014
|
|

203-11486 viewsBing Siding, BHP Iron Ore General Electric AC6000 model 6076 'Mt Goldsworthy' serial 51068 with an empty train. Cab side view with name board, steerable bogie and Driver Cosgrove at the controls.Aug 16, 2014
|
|

203-10416 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
|
|

203-08467 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.Aug 16, 2014
|
|

203-09436 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
|
|

203-07446 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working.Aug 16, 2014
|
|

203-06468 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. Cab side view with name board and steerable bogie.Aug 16, 2014
|
|

203-05462 viewsBing Siding, BHP General Electric built AC6000 unit 6076 'Mt Goldsworthy' serial 51068 in the passing track with a Yandi empty working.Aug 16, 2014
|
|

203-04628 viewsBing Siding, BHP General Electric built AC6000 class leader 6070 'Port Hedland' serial 51062 in the passing track as second unit on a Yandi empty working. The size of the BHP AC6000 model radiator is clearly evident here.Aug 16, 2014
|
|

203-01420 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
|
|

203-03492 viewsBing Siding, an empty train behind a pair of BHP General Electric AC6000 units 6076 'Mt Goldsworthy' serial 51068 and class leader 6070 'Port Hedland' serial 51062 run around the passing track up to the departure signal.Aug 16, 2014
|
|

203-02434 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
|
|

203-00480 viewsBing Siding, an empty train behind BHP General Electric AC6000 unit 6076 'Mt Goldsworthy' serial 51068 runs around the passing track with a loaded train on the mainline.Aug 16, 2014
|
|

202-33322 viewsYandi One, 307 km grade crossing, the last waggons on a loaded train, the last two are both Comeng style waggons, while the third, also being built by Comeng was originally built as a fixed wheel waggon with four axles, later converted to bogies.Aug 16, 2014
|
|

202-32355 viewsYandi One, 307 km grade crossing, mid-train remote CM40-8ML Goninan GE unit 5663 'Newcastle' serial 8412-08/94-154 was originally built 'cabless' but now fitted with one, also note the difference in the ALCo builds by the fuel tanks, 5666 was originally an M636C built by Comeng while 5663 was originally built by AE Goodwin.Aug 16, 2014
|
|

202-31440 viewsYandi One, 307 km grade crossing, mid-train remote CM40-8MEFI Goninan GE unit 5666 'Taranto' serial 8412-11/94-157 and CM40-8ML unit 5663 'Newcastle' show the difference in the ALCo builds by the fuel tanks, 5666 was originally an M636C built by Comeng while 5663 was originally built by AE Goodwin.Aug 16, 2014
|
|

202-30333 viewsYandi One, 307 km grade crossing sees a loaded train departing behind a CM40-8M and an CM40-8 unit with the rail grinder in the back track in the distance, the road curving around at the right goes to the Henry Walker camp.Aug 16, 2014
|
|

202-28319 viewsMeckering, looking east at the interlocking levers #1 and #2 and Pilot Key box 5B for the goods siding and derail at the east end of the crossing loop.Aug 16, 2014
|
|
19085 files on 955 page(s) |
 |
 |
 |
 |
 |
 |
 |
 |
786 |  |
 |
 |
 |
 |
 |
 |
|