Last additions |
![Filename=255-21.jpg
Filesize=533KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-21.jpg](albums/Pilbara/255/thumb_255-21.jpg)
255-2122 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-20.jpg
Filesize=499KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-20.jpg](albums/Pilbara/255/thumb_255-20.jpg)
255-2019 viewsWestern Creek, looking south alongside the Hamersley Iron Dampier to Tom Price line on the right with the new Robe River interconnecting line on the left as both lines pass under the Robe River Cape Lambert to Deepdale line bridge. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-19.jpg
Filesize=552KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-19.jpg](albums/Pilbara/255/thumb_255-19.jpg)
255-1927 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.Sep 12, 2021
|
|
![Filename=255-18.jpg
Filesize=608KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-18.jpg](albums/Pilbara/255/thumb_255-18.jpg)
255-1825 viewsAt the 162.2 km a Robe River Pettibone 445-E Speed Swing high rail crane. CRD 238.Sep 12, 2021
|
|
![Filename=255-17.jpg
Filesize=684KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-17.jpg](albums/Pilbara/255/thumb_255-17.jpg)
255-1722 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-16.jpg
Filesize=664KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-16.jpg](albums/Pilbara/255/thumb_255-16.jpg)
255-1619 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-15.jpg
Filesize=558KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-15.jpg](albums/Pilbara/255/thumb_255-15.jpg)
255-1522 viewsAt the 162.2 km looking north are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale lone is on the left while the spur runs behind the photographer and curves away from the Deepdale line. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-14.jpg
Filesize=616KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-14.jpg](albums/Pilbara/255/thumb_255-14.jpg)
255-1421 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur curving away to the left while the Deepdale line is on the right. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-13.jpg
Filesize=676KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-13.jpg](albums/Pilbara/255/thumb_255-13.jpg)
255-1317 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. The Deepdale line is on the right. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-12.jpg
Filesize=653KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-12.jpg](albums/Pilbara/255/thumb_255-12.jpg)
255-1222 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-11.jpg
Filesize=642KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-11.jpg](albums/Pilbara/255/thumb_255-11.jpg)
255-1123 viewsAt the 162.2 km looking south are the remains of the second Robe River loadout facility which was installed in 1975 to mine the Mesa 2402E mining area, the line was a four kilometre U shaped spur. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-10.jpg
Filesize=419KiB
Dimensions=853x1280
Date added=Sep 12, 2021 255-10.jpg](albums/Pilbara/255/thumb_255-10.jpg)
255-1020 viewsSiding Three looking south at the south end signal for loaded trains or up movements. Various cabinets and DD or dragging equipment detector bars. May 2002.Sep 12, 2021
|
|
![Filename=255-09.jpg
Filesize=527KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-09.jpg](albums/Pilbara/255/thumb_255-09.jpg)
255-0925 viewsSiding Three looking south at the south end points, switch machine and various cabinets and solar panels and DD or dragging equipment detector bars. May 2002.Sep 12, 2021
|
|
![Filename=255-08.jpg
Filesize=594KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-08.jpg](albums/Pilbara/255/thumb_255-08.jpg)
255-0821 viewsSiding Three, swing nose point machine on the south end points riding on concrete sleepers at the 134.7 km. May 2002.Sep 12, 2021
|
|
![Filename=255-07.jpg
Filesize=472KiB
Dimensions=853x1280
Date added=Sep 12, 2021 255-07.jpg](albums/Pilbara/255/thumb_255-07.jpg)
255-0736 viewsSiding Three looking south along the Cape Lambert to Deepdale mainline at the south end signal for the mainline, passing track is on the right with points in the distance. May 2002.Sep 12, 2021
|
|
![Filename=255-06.jpg
Filesize=617KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-06.jpg](albums/Pilbara/255/thumb_255-06.jpg)
255-06758 viewsSiding Three looking south along the Cape Lambert to Deepdale mainline at the south end signals. Passing track is on the right. May 2002.Sep 12, 2021
|
|
![Filename=255-05.jpg
Filesize=523KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-05.jpg](albums/Pilbara/255/thumb_255-05.jpg)
255-0520 viewsSiding Three looking south across the 133.3 km grade crossing with Tamper 1 and a sleeper inserter machine stabled in the back track. Both machines are Fairmont Tamper units. Geodata location here. May 2002.Sep 12, 2021
|
|
![Filename=255-04.jpg
Filesize=589KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-04.jpg](albums/Pilbara/255/thumb_255-04.jpg)
255-0426 viewsSiding Three back track, Robe 9456 Tamper 1, a Fairmont Tamper Mk VI switch tamper machine. May 2002.Sep 12, 2021
|
|
![Filename=255-03.jpg
Filesize=534KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-03.jpg](albums/Pilbara/255/thumb_255-03.jpg)
255-0330 viewsSiding Three back track, Fairmont Tamper sleeper inserter machine. May 2002.Sep 12, 2021
|
|
![Filename=255-02.jpg
Filesize=630KiB
Dimensions=1280x853
Date added=Sep 12, 2021 255-02.jpg](albums/Pilbara/255/thumb_255-02.jpg)
255-0222 viewsFortescue River bridge on the Robe River Cape Lambert to Deepdale line at the 115.8 km looking south. Geodata location here. May 2002.Sep 12, 2021
|
|
16487 files on 825 page(s) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
98 | ![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
![](images/spacer.gif) |
|