Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Home > Victorian negative and digital Albums

Last additions - Victorian negative and digital Albums
103-12.jpg
103-12502 viewsRutherglen, portable station building, staff hut, front view.Aug 12, 1990
103-11.jpg
103-11519 viewsRutherglen, remains of gangers hut, not turntable pivot in middle of broad gauge rails.Aug 12, 1990
103-10.jpg
103-10514 viewsSpringhurst station yard view looking north, mainline points on No.2 Rd for the Wahgunyah line have been spiked and clipped normal, standard gauge flyover on right, yard being rationalised, note redundant disc signal post 5 on ground.Aug 12, 1990
103-09.jpg
103-09506 viewsSpringhurst, semaphore signal post 4 with the top of the dolls cut off and the signal for the Wahgunyah line, standard gauge flyover on bank, point rodding, looking south from No.2 Rd.Aug 12, 1990
103-08.jpg
103-08485 viewsSpringhurst station yard view, staff exchange platform, elevation from access stairs, platform on the left and silo complex on the right, between No.2 and 3 Roads.Aug 12, 1990
103-07.jpg
103-07479 viewsSpringhurst V/Line broad gauge Plasser 07-16B Production Tamper or track tamper with V/Line asset number 6-52-013, an unidentified ballast regulator and a Tamper CSC-2 crib and shoulder compactor with V/Line asset number 6-57-008, track machines.Aug 12, 1990
103-06.jpg
103-06511 viewsSpringhurst V/Line broad gauge Plasser 07-16B Production Tamper or track tamper with V/Line asset number 6-52-013.Aug 12, 1990
103-05.jpg
103-05493 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge, signal levers visible in windows, staff exchange box on station wall.Aug 12, 1990
103-04.jpg
103-04519 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge, signal levers visible in windows, staff exchange box on station wall.Aug 12, 1990
103-03.jpg
103-03495 viewsSpringhurst station building overview, staff exchange platform and walkway across tracks, apparatus set up gauge laying on No.3 Rd.Aug 12, 1990
103-01.jpg
103-01494 viewsSpringhurst automatic staff exchanger cover in-between broad gauge running lines, point rodding under tracks.Aug 12, 1990
103-02.jpg
103-02497 viewsSpringhurst yard view, staff exchange platform, auto exchanger cover, point rodding, tamper, silo complex and bunker, loading platform.Aug 12, 1990
102-23.jpg
102-23510 viewsRed Cliffs station and yard overview looking south.Jun 09, 1990
102-18.jpg
102-18496 viewsHattah Lakes view of lake.Jun 09, 1990
102-16.jpg
102-16559 viewsDumosa station, view of the horizontal grain bunker.Jun 09, 1990
102-15.jpg
102-15531 viewsSpeed station platform access, annex silo for Geelong style complex.Jun 09, 1990
102-14.jpg
102-14554 viewsSpeed, Geelong style with annex and Ascom style silo complexes, overview track side, looking north.Jun 09, 1990
102-13.jpg
102-13561 viewsSpeed station yard overview, platform, building removed, radio repeater in distant background.Jun 09, 1990
102-12.jpg
102-12535 viewsSpeed radio repeater site.Jun 09, 1990
102-11.jpg
102-11576 viewsGama, Geelong style and Ascom silo complex with horizontal grain bunker, overview, track side.Jun 09, 1990
2770 files on 139 page(s) 138

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional