Image search results - "1299" |

060528 4592446 viewsWO type iron ore waggon WO 31299 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 178 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, loaded with fines at Bonnie Vale, 28th May 2005. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
|
|

100731 02355462 viewsWO type iron ore waggon WO 31299 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 178 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on loaded train 6413 at Binduli Triangle, July 31, 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
|
|

100822 5931480 viewsWO type iron ore waggon WO 31299 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 178 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle August 22, 2010. This unit was converted to WOS superphosphate in the late 1980s till 1994 when it was re-classed back to WO.
|
|

1299 Comeng 041001 15322897 viewsRedbank, loaded BHP Iron Ore waggon 1299, a Comeng WA original build from 1971, looks to have been partly resheeted. October 1, 2004.
|
|
|
|