Image search results - "1395-2396" |
080116 1364110 viewsChapman Siding at the 69 km on FMG's under construction line to Cloud Break mine, new waggons stabled in the passing track awaiting service, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007, here slave waggon 1395 and master waggon 2396 sit in the arvo sunlight. The yellow circle indicates the rotary coupler end and the tare weight of the slave waggon at 22.6 tonnes, while the master weighs 22.9 tonnes as it hosts the brake control equipment. 16th January 2008.
|
|
080116 136588 viewsChapman Siding at the 69 km on FMG's under construction line to Cloud Break mine, new waggons stabled in the passing track awaiting service, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007, here slave waggon 1395 and master waggon 2396 sit in the arvo sunlight. The yellow circle indicates the rotary coupler end and the tare weight of the slave waggon at 22.6 tonnes, while the master weighs 22.9 tonnes as it hosts the brake control equipment. 16th January 2008.
|
|
|
|
|