Image search results - "180" |

0180 060722 76052 viewsRobe River ore waggon 180, built by Nippon Sharyo Nihon, rotary coupler end handbrake side empty view, at the 11.7 km, Cape Lambert. July 22, 2006.
|
|

080120 1443r975 viewsRowley Yard which was the name for FMG's marshalling facilities has eleven of the General Electric built Dash 9-44CW locomotives lined up, 003, 013, 001, 010, 005, 014, 007, 004, 015, 002 and 011 coupled to ore waggon pair 2264 - 1263, pointing south. 20th January 2008.
|
|

080124 1628247 viewsChapman Siding, new FMG ore waggon pairs 1179 slave and 2180 control and 1259 slave and 2260 control, built by China Southern or CSR at their Zhuzhou Rolling Stock Works in China in 2007. 24th January 2008.
|
|

090912 2289r1636 viewsIndee, at the 48.5 km grade crossing for Indee Road, FMG General Electric built Dash 9-44CW units 003 serial 58180 and 004 serial 58181 power another loaded train from the Cloud Break mine under Proceed Authority 54 in the last rays of sunlight on the 12th September 2009.
|
|

100609 09977268 viewsMidland, AQNY 32180, one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic, running empty on train 3426 up Kalgoorlie Freighter.
|
|

105-07674 viewsWallan, broad gauge named V/Line A class loco A 71 'Dick Reynolds' with serial 83-1180 a Clyde Engineering Rosewater SA rebuild EMD model AAT22C-2R rebuilt from V/Line B class loco B 71 with serial ML2-12 a Clyde Engineering Granville NSW built EMD model ML2 with a Z set work down Cobram passenger train 8327 express through the station past semaphore signal post 12.
|
|

111-14583 viewsGheringhap station view, V/Line broad gauge A class A 71 Clyde Engineering EMD model AAT22C-2R serial 83-1180 rebuilt from B 71 Clyde Engineering EMD model ML2 serial ML2-12 and N set work the down Ararat via Nth Geelong passenger train 8105, pausing to swap the electric staff for the ordinary train staff ticket to Warrenheip, signaller has the train staff to show the driver and the ticket which the driver will use as his authority to Warrenheip. This working of special train staff and ticket was introduced in November 1993 for the line between Gheringhap and Warrenheip on weekends only, replacing the electric staff section Gheringhap to Meredith.
|
|

111-15498 viewsGheringhap, broad gauge V/Line A class A 71 Clyde Engineering EMD model AAT22C-2R serial 83-1180 rebuilt from B 71 Clyde Engineering EMD model ML2 serial ML2-12 and N set departing with the down Ararat via Nth Geelong passenger train 8105, point rodding, signals wires and the former station platform are visible.
|
|

124-05370 viewsSunshine V/Line broad gauge down passenger train with V/Line A class A 71 Clyde Engineering EMD model AAT22C-2R serial 83-1180 rebuilt from B 71 Clyde Engineering EMD model ML2 serial ML2-12 and N set, standard gauge Sunshine Loop up home signal on the far left, Newport Loop Line on the right.
|
|

140601 4474205 viewsWoodbridge, empty Carina bound iron ore train #1035, CFCLA leased CHCH type waggon CHCH 7780 these waggons were rebuilt between 2010 and 2012 by Bluebird Rail Operations SA from former Goldsworthy Mining hopper waggons originally built by Tomlinson WA and Scotts of Ipswich Qld back in the 60's to early 80's. 1st June 2014.
|
|

142-3-00346 viewsAlbury station yard, standard gauge NSWSRA candy liveried 81 class locos 8156 Clyde Engineering EMD model JT26C-2SS serial 84-1075 and 8180 serial 85-1099 bring a south bound down goods train into the platform where they will cut off and head to loco and V/Line power will attach and continue to Melbourne on the now up goods.
|
|

142-3-03276 viewsAlbury station yard, standard gauge NSWSRA candy liveried 81 class locos 8180 Clyde Engineering EMD model JT26C-2SS serial 85-1099 and 8156 shunt light engine to the loco fuel point after running a goods down from Sydney, semaphore signal post.
|
|

160531 9867274 viewsBinduli, 3PM4 steel train, RQIY 10180
|
|

160609 0481264 viewsWoodbridge, 5PM5 intermodal train, RRAY 7180 platform 1 of 5-pack articulated skel waggon set, one of a hundred built by ABB Engineering NSW 1996-2000, 40' deck with a 20' Air Liquide WA tanktainer AFLU 100032 and a 20' MAX 15 empty glass grate.
|
|

160609 0482270 viewsWoodbridge, 5PM5 intermodal train, RRAY 7180 platform 2 of 5-pack articulated skel waggon set, one of a hundred built by ABB Engineering NSW 1996-2000, 48' deck with a Pacific National 48' curtainsider PNXC 002.
|
|

160609 0483265 viewsWoodbridge, 5PM5 intermodal train, RRAY 7180 platform 3 of 5-pack articulated skel waggon set, one of a hundred built by ABB Engineering NSW 1996-2000, 48' deck with a Pacific National 48' curtainsider PNXC 4441.
|
|

160609 0484295 viewsWoodbridge, 5PM5 intermodal train, RRAY 7180 platform 4 of 5-pack articulated skel waggon set, one of a hundred built by ABB Engineering NSW 1996-2000, 48' deck with a Sadleirs 40' box RCS 4138.
|
|

160609 0485294 viewsWoodbridge, 5PM5 intermodal train, RRAY 7180 platform 5 of 5-pack articulated skel waggon set, one of a hundred built by ABB Engineering NSW 1996-2000, 40' deck with two 20' boxes, Royal Wolf RWTU 965616 and Linfox FSWB 963508.
|
|

161111 2405295 viewsKalgoorlie, Malcolm freighter train 5029, waggon AQNY 32180 one of sixty two waggons built by Goninan WA in 1998 as WQN type for Murrin Murrin container traffic with an undecorated Bis Industries hard-top 25U0 type sulphur container BISU 100048 and original style sulphur container S107U 949 with original style door and sliding tarpaulin.
|
|

164-19361 viewsMurchison East, V/Line Grain VHGF type bogie grain waggon VHGF 180, built as a GJX type by Steelweld Victoria in July 1969 is being loaded, coupled to two other VHGF waggons, from the Ascom silo complex, worker on top of waggon operating loading spout, Murphy silo complex and super phosphate shed on the right
|
|
|