Image search results - "2429" |

2429 Comeng 040815 170316100 viewsNelson Point, Car Dumper 1, loaded BHP Iron Ore waggon 2429, a Comeng WA build from the third batch built in 1970. August 15, 2004.
|
|

2429 Comeng 040815 170334129 viewsNelson Point, Car Dumper 1, loaded BHP Iron Ore waggon 2429, a Comeng WA build from the third batch built in 1970. August 15, 2004.
|
|

2429 Comeng 040815 170352101 viewsBHP Iron Ore waggon 2429 builders plate, a Comeng WA build from the third batch built in 1970. August 15, 2004.
|
|

250501 0530406 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2429 - GA 2430, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
|
|
|
|