Pilbara Railways Image Collection

The entire photo collection of images scanned from negatives and slides and digital images.


Home Login
Album list Last uploads Last comments Most viewed Top rated My Favourites Search
Image search results - "296"
0296_110602_1695.jpg
0296 110602 16952 viewsRobe River ore waggon 296, built by Nippon Sharyo Nihon, rotary coupler end handbrake side loaded view at the 71 km, Western Creek on the Deepdale line. June 2, 2011.
0296_160306_1278.jpg
0296 160306 12781 viewsRobe River ore waggon 296, built by Nippon Sharyo Nihon, fixed coupler non-handbrake side empty view at Greenpool on the Cape Lambert line. March 6, 2016.
0296_170513_8665.jpg
0296 170513 86652 viewsRobe River ore waggon 296, built by Nippon Sharyo Nihon, handbrake side loaded view, Cape Lambert yard, May 13, 2017.
060528_4598.jpg
060528 4598246 viewsWO type iron ore waggon WO 31296 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 175 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, loaded with fines seen here at Bonnie Vale, 28th May 2006. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
100731_02342.jpg
100731 02342206 viewsWO type iron ore waggon WO 31296 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 175 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, on loaded train 6413 at Binduli Triangle, 31st July 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
100731_03126.jpg
100731 03126202 viewsWOE type iron ore waggon WOE 30296 is one of a batch of one hundred and thirty built by Goninan WA between March and August 2001 with serial number 950092-046 and fleet number 638 for Koolyanobbing iron ore operations, empty train arriving at Binduli Triangle, 31st July 2010.
100822_5944.jpg
100822 5944177 viewsWO type iron ore waggon WO 31296 is one of a batch of fifteen built by WAGR Midland Workshops between July and October 1968 with fleet number 175 for Koolyanobbing iron ore operations, with a 75 ton and 1018 ft³ capacity, Binduli Triangle 22nd August 2010. This unit was converted to WOC for coal in 1986 till 1994 when it was re-classed back to WO.
160527_5514.jpg
160527 5514318 viewsKalgoorlie, 5PS6 intermodal train powers away from Kalgoorlie as it is about to pass under the Goldfields Highway behind Goninan built GE model Cv40-9i NR class units NR 95 serial 7250-06/97-296 and NR 96 serial 7250-06/97-297.
190107_0564.jpg
190107 0564261 viewsBinduli, on empty Mineral Resources Ltd iron ore train service from Esperance to Koolyanobbing 2034 with MRL's MHPY type iron ore waggon MHPY 00296 built by CSR Yangtze Co China serial 2014/382-296 in 2014 as a batch of 382 units, these bottom discharge hopper waggons are operated in 'married' pairs.
193-26.jpg
193-26293 viewsGympie yard, WHA type open grain waggon WHA 29630, originally built by Evans Deakin Qld in 1955-56 as a WH type open waggon.
250501_0391.jpg
250501 0391134 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, loaded Roy Hill waggon pair GA 3295 - GA 3296, built in China by CRRC Yangtze as an CCK138 model ore waggon in Breast Cancer Awareness pink livery. May 1, 2025.
250501_0507.jpg
250501 0507128 viewsAt the 88.448 km, just south of HPPL crossing loop on the Roy Hill line, empty Roy Hill waggon pair GA 2963 - GA 2964, built in China by CSR Yangtze as an CCK138 model ore waggon. May 1, 2025.
12 files on 1 page(s)

Set Back to Pilbara Yard / Photo Gallery / Blog / Departure Yard / BHP Road / Fortescue Metals Road / Rio Tinto Road / Roy Hill Road / Comalco Siding
Your IP address is: Website and all images are © 1997-2025 www.pilbararailways.com.au Contact Us
Valid XHTML 1.0 Transitional